background image

ICE-BALANCER

For further information on our complete range of products and services please visit our website at 

www.rud.com.au

User Instructions - Part 1 

Safety instructions

This safety instruction/declaration of the manufacturer must be 

kept on file for the lifetime of the product.

ATTENTION: Please inspect all components prior to use. 
Damaged, incorrect assembly or improper use may result 
in serious injuries and/or material damage.

EC-Declaration of the manufacturer

According to the Machinery Directive 2006/42/EC, annex II B 

and amendments.

We hereby declare that the design and construction of the 
equipment detailed within this document, adheres to the 
appropriate level of health and safety of the corresponding EC 

regulation.
Any  un-authorised  modification  and/or  any  incorrect  use  of 

the equipment not adhered to within these user instructions 

waivers this declaration invalid. 

The equipment must be regularly tested and inspected as per 

BGR 500. Failure to carry out the recommended maintenance 

and testing waivers this declaration invalid.

Designation of the equipment:

Type: 

ICE-Balancer

Manufacturer’s mark:

Drawings (iges, dxf and step), product information and other 

support material can be downloaded from www.rud.com.au.

Complies with the machinery directives 2006/42/EC

NB: Please ensure that the safety instructions have been fully read and understood before initial use of the ICE-Balancer. 
Failure to do so may result in serious injuries and/or material damage and eliminates manufacturers warranty.

Summary of Contents for Ice 120

Page 1: ...he appropriate level of health and safety of the corresponding EC regulation Any un authorised modification and or any incorrect use of the equipment not adhered to within these user instructions waiv...

Page 2: ...l load spreading sharing Max inclination angle 45 90 internal sling angle WARNING The 2 leg sling with the balancer should not be used seperatly as a 2 leg sling Lifting means for lifting of loads mus...

Page 3: ...connected to the balancer using IVS ICE Connecting Links Sequence of assembly 1 Install last chain link into the nose Pic 3 NOTE At the beginning of the bow rounding the chain link can be turned 90 wi...

Page 4: ...ge A skewing of the balancer under load by more than 10 is prohibited Pic 12 The 10 edge is no longer aligned horizontal The skewing of the balancer is too big WARNING Skewing of the balancer by more...

Page 5: ...ontinued suitability Also inspect after damage and special occurrences 4 Inspection criteria Check and control the following points before each initial operation in periodical periods after the assemb...

Page 6: ...ght kg pc Reference Number 6 IAK 2S 6 18 x 90 x 160 265 1 8 7904659 8 IAK 2S 8 26 x 100 x 180 309 4 09 7904660 10 IAK 2S 10 32 x 110 x 200 369 7 37 7904661 13 IAK 2S 13 36 x 140 x 260 467 12 44 790466...

Page 7: ...s can be assumed to be load bearing This is not valid if it is guaranteed that the load will be distributed equally to 2 additional legs By using the ICE balancer the load distribution of a 2 x 2 leg...

Page 8: ...ICE BALANCER ICE BALANCER...

Reviews: