W
ALL / CEILING MOUNT
TEMPLA
TE
M
OU
NTIN
G
T
DRILL HER
E
CEILING / BRACKET
mm
Page 1: ...3 Using an AC adapter sold separately connect the AP to a convenient and protected power source Alternatively connect the 10 100 1000 POE port to a PoE injector or switch for both power and network co...
Page 2: ...your network 4 Connect the AP power adapter or PoE power supply to the AP then to a convenient power source 5 Verify that the 10 100 1000 port LED is lit After a short pause to re establish the Inter...
Page 3: ...ce Figure 3 Figure 2 Place the AP onto the T bar Figure 3 Rotate the AP so that it locks in place 2 To remove the unit from the T Bar insert a straightened paperclip into the hole on the side of the A...
Page 4: ...WALL CEILING MOUNT TEMPLATE MOUNTING T DRILL HERE CEILING BRACKET mm...