6
A
B
B
2.0
Floor Installation
A
Using a rubber mallet and screwdriver, knock out the
tabs for the door hinge, two places on
Front Floor (A)
.
c.
Using a rubber mallet and
screwdriver, punch out
the screw holes along
the connection edge
of both
Repeat
Floors (B)
.
a.
B
B
Using a utility knife, cut the long side of each wall slot tab and
then use a rubber mallet and screwdriver to knock it out:
• 4 places on
Front Floor (A)
• 4 places on
Repeat Floor (B):
middle location
• 8 places on
Repeat Floor (B)
: rear location
b.
A
B
B
1.
2.
Summary of Contents for 5L40
Page 4: ...4 QQ x1 HH x2 JJ x1 GG x1 BB x2 CC x1 ...
Page 21: ...21 Set Back Roof Assembly onto the Shed Assembly e BRACKET TO WALL ...
Page 40: ...40 QQ x1 HH x2 JJ x1 GG x1 BB x2 CC x1 ...
Page 57: ...57 Posez l assemblage du toit arrière sur l assemblage de la remise e SUPPORT SUR MUR ...
Page 76: ...76 QQ x1 HH x2 JJ x1 GG x1 BB x2 CC x1 ...
Page 93: ...93 Coloque el conjunto posterior del techo en el conjunto del cobertizo e SOPORTE A LA PARED ...