14
FP8K-B / FP8K-DX / FP8K-DX-XLT
Jun 2017-A
26. After leveling is complete, tighten the Jam Nut on the Lock Ladder, underneath the Top Cap on
each post. This will secure the Lock Ladder in position.
27. Raise lift off all locks until cables are supporting the lift. Adjust the Cable
’s Nylon Lock Nut
(#89) as shown in Fig 6, located on the top of each post until lift is level on crossbeams and
runways. This will ensure the lift travels up and down level.
Note: You may need to use locking pliers to hold the Cable from turning when adjusting
the Nylon Nut. Make sure that threads engage through the nylon on each Nylon Nut.
28.
Install the Plastic
‘drip’ Boards (# 51A) into the bracket slots on the underside of the Mainside
Runway, as shown below in Fig 11.
Fig.11
29. Insert Wheel Stop Plates (Item # 43) at each end of Runways, as shown below Fig 12.
Note: The usage of additional Wheel Stop Plates are recommended when lifting and/or
storing a vehicle, with or without the Drive-On Ramps.
Fig. 12
30. Install
‘drive-on’ Ramps (#53) at rear of Lift.
31. Install the Jack / Tool Tray & Drip Trays between the Runways.
NOTE: Ensure to lubricate ALL Cable Sheaves, Bearings and Shafts with grease prior to
operating Lift.
The Lift installation is now complete.
Plastic
‘drip’ Board
Summary of Contents for RTD8KDX
Page 23: ...23 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 1...
Page 24: ...24 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 2...
Page 25: ...25 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 3...
Page 26: ...26 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 4 41...
Page 27: ...27 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 5...