20
M0720-1 ver 3.4
2.7 Mounting of TC ground socket, P7239
Action
Note
1
Mount TC ground socket
Mount the ground socket in the
tool changer with enclosed screw
and washers.
NOTE!
Apply a small amount
contact grease bef ore mounting.
2
Mount PE label
Mount the enclosed PE label in
the dedicated area close to the
RSP label.
3
Mount PE cabling
Mount the robots earth cable with
either an M8 or an M5 screw.
NOTE!
The dedicated screw holes
are situated close to the PE
marking.
Summary of Contents for M0720-1
Page 2: ...2 M0720 1 ver 3 4 ...
Page 63: ...M0720 1 ver 3 4 63 ...
Page 64: ...64 M0720 1 ver 3 4 ...