12.4 - Adding the Downhaul Control Line
a)
Tie these two ends of the downhaul control line
to the eyelet on the floor of the cockpit, just to
starboard of the mast step.
Take the loose end of the downhaul control line and feed
it through the starboard cleat on the foredeck as shown.
Make sure the rope goes the right way through the cleat.
b)
c)
A
Locate the following components in the SCS kit:
Downhaul
Downhaul
control line
Downhaul
control line
block
Qloc
Qloc tie
Summary of Contents for Venture Connect
Page 1: ...Rigging Guide V3...
Page 8: ...Rigging Guide PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 23: ...Rigging Guide 5 Sails PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 36: ...Rigging Guide 7 Keel PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 42: ...Rigging Guide 9 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 96: ...Power Assisted Steering and Mainsheet V2 PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 113: ...19 3 Afloat a b c...
Page 125: ...PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER Seated Control System 22 Problem Solving...
Page 128: ...SCS Modifications...
Page 132: ...Appendix 1 Steering System...
Page 133: ...Rigging Guide 10 Completion PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 135: ...Rigging Guide 11 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 139: ...Rigging Guide 12 Maintenance PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 142: ...Rigging Guide 13 Warranty PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 146: ...Rigging Guide 15 Glossary...