PRODUCT OPERATION
BEFORE PLUGGING IN THE UNIT TO A POWER SOURCE:
1.
Let the appliance stand upright for about 2 hours. This will reduce the chance of malfunction
in the cooling system from possible mishandling during delivery.
2.
Check to make sure the rubber drain plugs are securely plugged into the drain ports on the
back of the unit to prevent water leaks.
3.
Check to make sure the exhaust hose has been installed properly. (See Installation page 5).
4.
Check to make sure that the air conditioner has been properly vented out the window (See
Installation page 5).
Conduct a Power Plug Check:
1.
Press the RESET button on the power cord.
2.
Plug the cord into an electrical outlet.
3.
Press the TEST button on the power cord. The RESET button should pop up.
4.
Press the RESET button for use.
5.
Do not use the air conditioner if the test fails. The green light on the power cord will
turn on if the plug is working properly.
NOTE:
IF YOU TURN THE AIR CONDITIONER OFF AND IMMEDIATELY RESTART IT,
ALLOW 3 MINUTES FOR THE COMPRESSOR TO RESTART COOLING. IN THE EVENT OF A
POWER FAILURE, WAIT 3 MINUTES BEFORE RESTARTING THE UNIT.
Operation Temperature Range
Maximum cooling
Minimum cooling
DB / WB (
°
F)
95/75 (35/24
°
C)
64/54 (17.7/12
°
C)
6