Document Number 900-21806 Rev C
15
Maintenance
Each time the crawler is removed from the pipeline the entire assembly should
be washed cleaned.
A light spray of chain oil should be used on each track assembly.
Inspect individual crawler feet for damage. Replace if necessary.
Inspect the power cable, bridle, and connector to make sure they have not
been damaged.
Inspect the camera clamps, skids, and mounting hardware.
Inspect bridle, skids, rails, and pigtail connections.
.