background image

Design and Manufacture of Video Pipeline Inspection Systems

A full Service Company

www.rstechserv.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

6

 

 

C

C

r

r

a

a

w

w

l

l

e

e

r

r

 

 

T

T

r

r

a

a

n

n

s

s

p

p

o

o

r

r

t

t

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

V

e

e

h

h

i

i

c

c

l

l

e

e

                         

M

M

M

o

o

o

d

d

d

e

e

e

l

l

l

 

 

 

 

 

 

3

3

3

2

2

2

-

-

-

0

0

0

5

5

5

0

0

0

0

0

0

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

O

P

P

E

E

R

R

A

A

T

T

I

I

O

O

N

N

S

S

 

 

M

M

A

A

N

N

U

U

A

A

L

L

 

M

M

M

a

a

a

d

d

d

e

e

e

i

i

i

n

n

n

t

t

t

h

h

h

e

e

e

U

U

U

S

S

S

A

A

A

Summary of Contents for 32-05000

Page 1: ...ompany www rstechserv com 6 6 C Cr ra aw wl le er r T Tr ra an ns sp po or rt t V Ve eh hi ic cl le e M M Mo o od d de e el l l 3 3 32 2 2 0 0 05 5 50 0 00 0 00 0 0 O OP PE ER RA AT TI IO ON NS S M MA...

Page 2: ...roduct Information Page 4 Technical Specifications Page 6 Operator and Equipment Safety Page 7 Equipment Compatibility Page 8 Accessory Kits Page 9 System Power and Operation Page 15 Maintenance Page...

Page 3: ...ler can be adjusted to improve traction if needed Using sincon cable the unit travels three speed in forward one speed reverse with freewheel for practical operation The crawler is controlled by the a...

Page 4: ...er minute max 1 reverse Low speed only Stop hold Free wheel rapid retrieval Power 70 to 120VDC from camera cable Internal auto limiting 2 amps Motor type 1 3 horsepower high torque motor Drive type 18...

Page 5: ...dth adjustments and when maintaining the tractor or camera disconnect all power to the control station before servicing Inspect all transport camera lighting cables and bridles before and after each u...

Page 6: ...well as Portable Mainline systems This transport requires the use of a power unit control box cable reel and camera RST Main Line Reel RST Portable Reel RST Omni Eye III Zoom RST Omni Star It may be...

Page 7: ...7 Accessory Kits for 6 Crawlers The RST crawler generally comes with the following accessories Standard extension camera mounting kit for 6 to 15 applications Part number 840 30586 22 23 24 6 30 28 2...

Page 8: ...ENSION SET CRAWLER 4 0 EA 9 867 30927 ASSY SPACER 3 18 LONG EXTENSION SET CRAWLER 4 0 EA 20 800 17114 ASSY SPACER 1 0 M L TRACTOR TREAD 4 0 EA 21 402 17109 SPACER MTG 1 0 EXTENSION ML TRACTOR TREAD 2...

Page 9: ...different control panel that is separate from the controller power supply Refer to the appropriate generator operators manual for starting Verify that the voltage and frequency indicators on the cont...

Page 10: ...om to work around the opening while carrying the equipment Placing the equipment into the line Follow cable grip bridle and pig tail instructions Re check the pipeline size and extension adjustments D...

Page 11: ...ly The adjustable camera power supply provides a nominal 120V DC to the camera transporter and other down hole inspection equipment This section has video processing circuitry which extracts the video...

Page 12: ...ck over the Sincon Cable The Crawler has an automatic disengage feature that allows for the freewheeling retrieval To disengage the Crawler momentarily reverse the direction of Crawler This will disen...

Page 13: ...wn Rt Turn elevup UP Foc In Foc Out Dual FunctionControl Box Display PanRT PanLeft Wht Bal AutoFoc Medium Auxiliary Control Box Button function Crawler Controls High tractor high speed in tractor mode...

Page 14: ...ects Do not force Crawler camera past any large amount of debris Beware of large root masses Use extra caution around severe offset joints or protruding laterals Take notes when passing obstacles or s...

Page 15: ...hed cleaned A light spray of chain oil should be used on each track assembly Inspect individual crawler feet for damage Replace if necessary Inspect the power cable bridle and connector to make sure t...

Page 16: ...Document Number 900 21806 Rev C 16...

Page 17: ...94954 Mt Sterling KY 40353 RST shall at our option repair or replace any defective part or component in our service facility or ship the customer a replacement component or part The customer shall ret...

Page 18: ...you issue P O Numbers before repair enter the number here Estimate if Over Enter the maximum you can authorize without being contacted by RST for approval This will add time to your repair Estimate B...

Page 19: ...ervice Company SALES SERVICE PARTS THE FOLLOWING FORM IS PROVIDED FOR YOUR CONVENIENCE MAKE COPIES OF THE FORM FOR YOUR USE FILL OUT THE FORM COMPLETELY AND OBTAIN AN MRA NUMBER MAKE A COPY OF THE COM...

Page 20: ...___________________ Estimate Required Before Repair Other ____________________________ Repair ___________________________________ Model Number____________________Description___________________________...

Reviews: