background image

R

www.royalcraft.co.uk

CAMBRIDGE 1

7 / 33

Summary of Contents for CAMBRIDGE 1

Page 1: ...roduct size 213x127x190cm 7x4 2 FT IMPORTANT TO FOLLOW THESE ASSEMBLY INSTRUCTIONS Important please retain for future reference Read carefully Requires two people and takes 3 4 hours for Installation www royalcraft co uk 1 33 ...

Page 2: ...ed for the assembly of the shed Familiarize yourself with the operation of all the power tools For floor covering the owner can purchase flooring material locally We have supplied the foundation kit with the shed which can be used as floor base Instructions about how to assemble foundation kit and how to fix flooring to the foundation kit are included in the manual Location and Base A good locatio...

Page 3: ...h the assembly in a day to avoid damage to the product or missing of some small parts 3 Wearing safety gloves eye protection and long sleeves during the assembly to prevent injury Pay attention to the sharp edge of some parts 4 Children and pets are not allowed entering into the construction site 5 Never concentrate your total weight on the roof of the building When using a step ladder make sure t...

Page 4: ...R www royalcraft co uk CAMBRIDGE 1 4 33 ...

Page 5: ...R UNDER www royalcraft co uk CAMBRIDGE 1 5 33 ...

Page 6: ...www royalcraft co uk CAMBRIDGE 1 6 33 R ...

Page 7: ...R www royalcraft co uk CAMBRIDGE 1 7 33 ...

Page 8: ...R www royalcraft co uk CAMBRIDGE 1 8 33 ...

Page 9: ...R www royalcraft co uk CAMBRIDGE 1 9 33 ...

Page 10: ...R www royalcraft co uk CAMBRIDGE 1 10 33 ...

Page 11: ...R www royalcraft co uk CAMBRIDGE 1 11 33 ...

Page 12: ...R www royalcraft co uk CAMBRIDGE 1 12 33 ...

Page 13: ...R www royalcraft co uk CAMBRIDGE 1 13 33 ...

Page 14: ...R www royalcraft co uk CAMBRIDGE 1 14 33 ...

Page 15: ...R www royalcraft co uk CAMBRIDGE 1 15 33 ...

Page 16: ...R www royalcraft co uk CAMBRIDGE 1 16 33 ...

Page 17: ...R www royalcraft co uk CAMBRIDGE 1 17 33 ...

Page 18: ...R www royalcraft co uk CAMBRIDGE 1 18 33 ...

Page 19: ...R www royalcraft co uk CAMBRIDGE 1 19 33 ...

Page 20: ...R www royalcraft co uk CAMBRIDGE 1 20 33 ...

Page 21: ...R www royalcraft co uk CAMBRIDGE 1 21 33 ...

Page 22: ...R www royalcraft co uk CAMBRIDGE 1 22 33 ...

Page 23: ...R www royalcraft co uk CAMBRIDGE 1 23 33 ...

Page 24: ...R www royalcraft co uk CAMBRIDGE 1 24 33 ...

Page 25: ...R www royalcraft co uk CAMBRIDGE 1 25 33 ...

Page 26: ...R www royalcraft co uk CAMBRIDGE 1 26 33 ...

Page 27: ...R www royalcraft co uk CAMBRIDGE 1 27 33 ...

Page 28: ...R www royalcraft co uk CAMBRIDGE 1 28 33 ...

Page 29: ...ease always wear work gloves 2 pairs of golves are provided with the shed for safe construction eye protection and long sleeves when assembling or performing any maintenance on your kit 2 GROUND MUST BE LEVEL Be sure foundation kit frames lie flat on ground To prepare the earth bed remove sod and other organic debris level the high spots with a flat shovel and tamp the bed down 3 DO NOT STEP ON CH...

Page 30: ...R www royalcraft co uk CAMBRIDGE 1 30 33 ...

Page 31: ...R www royalcraft co uk CAMBRIDGE 1 31 33 ...

Page 32: ...es B 25 35mm long self drilling screws to secure Plywood Flooring NOTE Pressure Treated Lumber must not be used because it may cause corrosion when in contact with metal shed Plywood Flooring A Plywood Flooring Recommended minimum thickness 16mm 5 8 Exterior Grade Recommended dimensions for plywood flooring Image mm Qty 2 pcs 1 pc 16 pcs www royalcraft co uk CAMBRIDGE 1 32 33 www royalcraft co uk ...

Page 33: ...R 3 Fasten Plywood to foundation kit frames with self drilling screws www royalcraft co uk 33 33 ...

Reviews: