Royalcraft ASCOT 1 Assembly Instructions Manual Download Page 3

R

Parts and Parts List:

Before you start, separate and identify all the parts and hardware to be sure that you have all
the necessary parts for your building (refer to the Parts List Page).

Do  not  attempt  to  assemble  the  building  if  parts  are  missing  because  any  building  left
partially assembled may be seriously damaged by light winds.

Personal 

Tools you 

will 

N

eed:

( Please tear off the safety protection layer before the assembly, keep the part number

label if needed )

 

Safety must be put in the No. 1 position:

1.  Select a dry and calm day for your assembly.
2.  Team  works  (2  or  more  people)  are  required  during  the  assembly.  It  is  also

recommended to finish the assembly in a day to avoid damage to the product or missing
of some small parts.

3.  Wearing safety gloves, eye protection and long sleeves during the assembly to prevent

injury. Pay attention to the sharp edge of some parts.

4.  Children and pets are not allowed entering into the construction site.
5.  Never concentrate your total weight on the roof of the building.

When using a step ladder make sure that it is safe.

Care & Maintenance:

1.    Keep the shed clean with soft cloth, use water if necessary.
2.    Keep the door tracks clear of dirt and other stuff that prevent them from sliding easily.
3.    Clean the snow with necessary tools to make sure it is safe to enter into.
4.    The shed is not made for living but storing stuff.
5.    Please add some oil on the top and bottom door sliding channel to make door slides

smoothly.

www.royalcraft.co.uk

ASCOT 1

3 / 29

Summary of Contents for ASCOT 1

Page 1: ...oduct size 213x130x173cm 7 0x4 2 FT IMPORTANT TO FOLLOW THESE ASSEMBLY INSTRUCTIONS Important please retain for future reference Read carefully Requires two people and takes 3 4 hours for Installation www royalcraft co uk 1 29 ...

Page 2: ...used for the assembly of the shed Familiarize yourself with the operation of all the power tools For floor covering the owner can purchase flooring material locally We have supplied the foundation kit with the shed which can be used as floor base Instructions about how to assemble foundation kit and how to fix flooring to the foundation kit are included in the manual Location and Base A good locat...

Page 3: ...ish the assembly in a day to avoid damage to the product or missing of some small parts 3 Wearing safety gloves eye protection and long sleeves during the assembly to prevent injury Pay attention to the sharp edge of some parts 4 Children and pets are not allowed entering into the construction site 5 Never concentrate your total weight on the roof of the building When using a step ladder make sure...

Page 4: ...R Size Area of installation requirement www royalcraft co uk ASCOT 1 4 29 ...

Page 5: ...R www royalcraft co uk ASCOT 1 5 29 ...

Page 6: ...ASCOT 1 6 29 www royalcraft co uk R ...

Page 7: ...R www royalcraft co uk ASCOT 1 7 29 ...

Page 8: ...R www royalcraft co uk ASCOT 1 8 29 ...

Page 9: ...R www royalcraft co uk ASCOT 1 9 29 ...

Page 10: ...R www royalcraft co uk ASCOT 1 10 29 ...

Page 11: ...R www royalcraft co uk ASCOT 1 11 29 ...

Page 12: ...R www royalcraft co uk ASCOT 1 12 29 ...

Page 13: ...R www royalcraft co uk ASCOT 1 13 29 ...

Page 14: ...R www royalcraft co uk ASCOT 1 14 29 ...

Page 15: ...R www royalcraft co uk ASCOT 1 15 29 ...

Page 16: ...R www royalcraft co uk ASCOT 1 16 29 ...

Page 17: ...R www royalcraft co uk ASCOT 1 17 29 ...

Page 18: ...R www royalcraft co uk ASCOT 1 18 29 ...

Page 19: ...R www royalcraft co uk ASCOT 1 19 29 ...

Page 20: ...R www royalcraft co uk ASCOT 1 20 29 ...

Page 21: ...R www royalcraft co uk ASCOT 1 21 29 ...

Page 22: ...R www royalcraft co uk ASCOT 1 22 29 ...

Page 23: ...R www royalcraft co uk ASCOT 1 23 29 ...

Page 24: ...R www royalcraft co uk ASCOT 1 24 29 ...

Page 25: ...always wear work gloves 2 pairs of golves are provided with the shed for safe construction eye protection and long sleeves when assembling or performing any maintenance on your kit 2 GROUND MUST BE LEVEL Be sure foundation kit frames lie flat on ground To prepare the earth bed remove sod and other organic debris level the high spots with a flat shovel and tamp the bed down 3 DO NOT STEP ON CHANNEL...

Page 26: ...R www royalcraft co uk ASCOT 1 26 29 ...

Page 27: ...R www royalcraft co uk ASCOT 1 27 29 ...

Page 28: ...stores B 25 35mm long self drilling screws to secure Plywood Flooring NOTE Pressure Treated Lumber must not be used because it may cause corrosion when in contact with metal shed Plywood Flooring A Plywood Flooring Recommended minimum thickness 16mm 5 8 Exterior Grade Recommended dimensions for plywood flooring Image mm Qty 2 pcs 1 pc 16 pcs www royalcraft co uk ASCOT 1 28 29 www royalcraft co uk ...

Page 29: ...R 3 Fasten Plywood to foundation kit frames with self drilling screws www royalcraft co uk ASCOT 1 29 29 ...

Reviews: