3. Wall panels
Position the back panel and the left-hand side panel as shown. Note how the panel frames sit on the floor with the panel
cladding overhanging the floor edge. Ensure square and secure using 3 x 50mm screws through the frame of the side panel,
into the frame of the back panel. Repeat for other side panel and then add the front panel in the same way as the back.
2. Floor
Attach the three floor frames to the floor using 4 x 30mm nails per frame. Have the two outer frames flush with the
edge of the floor and centre the middle bearer. Nail through the floor into the frames.
50mm
4. Secure walls to floor
Secure the front panel to the floor using 2 x 50mm screws. Screw through the bottom frame of the front panel into the
floor. For the side panels, nail through the panel cladding into the floor frames using 3 x 30mm nails per side. Secure the
back panel in the same way using 4 x 30mm nails.
Drill pilot hole for each screw in this section.
19mm
1. Door
Lay the front panel flat on the ground. Place door into position. Fix the two T-hinges to the door with 4 x 25mmk screws
per hinge. Secure the hinges to the door frame using 3 x 25mm screws per hinge. Fit the turn button to the door frame
using 1 x 25mm screw and then fit the hasp and staple with 5 x 19mm roundhead screws, see the diagram below for the
position of these.
10mm
Felt
nails
10mm
Felt
nails
10mm
Felt
nails
6. Roof felt
Lay the roofing felt on the roof with an overhang all round. Fold the felt down at the front and secure using 8 x 10mm
felt nails to the felt batten. Tension the felt over the roof and fold down at the back and secure to the back panel using
8 x 10mm felt nails. Dress down each end of the felt and secure to the side panels using 7 x 10mm felt nails per end.
Once the felt is secure trim of any excess felt.
Note:
Ensure the panel is flush at the
front and at each end of the felt
batten.
30mm
30mm
5. Roof
Fix the roof panel flush to the felt batten as shown, using 5 x 30mm nails, nail through the roof into the batten. Lift the
roof onto the assembly with the felt batten at the front. Ensure the roof is flush at the sides and back of the store and
secure in place using 5 x 30mm nails along the front and back, 3 x 30mm nails on both sides.
Floor
Side panel
50mm
Panel frames
rest on floor.
Panel cladding
overhangs floor edge.
Back panel
3mm
Drill
Front panel
Left side panel
Right side panel
30mm
30mm
30mm
Use this diagram to check
the correct orientation of
the corners
Important
25mm
25mm
50mm
50mm
Note:
Secure front panel to
the sides in the same
way as the back.
Back panel
30mm