QTY.
Part NO.
W05 14
S01 16
M01 16
Step 2
W05
Step 1
W
B01
B01
2
B02
B02
2
B03
B03
4
07 10
S03 10
W05
W07
Base frame assembly
For greenhouses being positioned on a
hard surface e.g concrete.
S03
W07
Concrete Ground
(For assembly on soft surface e.g grass please see next page)
When fixing the greenhouse to the base, please loosen the
screws of the greenhouse and then fix the W05 with it. There
are no extra screws for the base.
Summary of Contents for SS260
Page 1: ...PLEASE READ CAREFULLY BEFORE ASSEMBLY SS260 8x6 Greenhouse...
Page 5: ...2 2 Step 3...
Page 17: ...12 19 Step 6 Y6 L02A Y6 3pcs Step 3 10 Step 7 Y6 Y6 L02A L02A Y6 L07...
Page 18: ...13 19 Step 8 Step 9 Y6 L02A L02A Y6 Y6 Y6 L02A L07 L08B L05C L05C L05C L05C Step 4 14...
Page 19: ...14 19 Step 11 Y7 L02B 4pcs Step 10 L06...
Page 20: ...15 19 Step 2 3 Y7 L02B 5pcs Step 12 Step 13...
Page 21: ...16 19 Step 15 L03B Y9 L03B L02B W04 L03B W08 S01 4PCS Y7 L02B 5pcs Step 14...
Page 22: ...Step 17 17 19 Step 2 3 Step 16 Y7 L02B Y7 L02B 4pcs 5pcs...
Page 23: ...Step 18 Step 19 L03B W08 S01 4PCS 18 19 Y9 L03B L03B L02B W04 L02B Y7 5pcs...