Rowlinson Garden Products SHPOT Assembly Instructions Manual Download Page 3

50mm

Drill pilot holes with a 3mm drill bit for all
screws in this section.

3mm

Drill

50mm

Roof centre block and inside capping

Side view

End view

Assemble component

Important note

Ensure roof block assembly is
sitting level and support this
end securely with a prop.

50mm

  5. Roof part 2   

Lift on the the left and right-hand glazed roof panels. Add a bead of silicon down the edge adjoining the solid roof panels and secure to   the roof sections using 2 x 50mm
screws per panel.

View from inside the potting store looking up 

Drill pilot holes with a 3mm drill bit for all
screws in this section.

3mm

Drill

40mm

6. Roof part 3

Position the triangular roof panels as shown, loosely secure them together using 2 x 50mm screws per join as shown. Adjust the roof panels to achieve the best fit. Add a
bead of silicon between each roof panel then fully tighten the screws.

Drill pilot holes with a 3mm drill bit for all
screws in this section.

3mm

Drill

View from inside the potting store looking up 

Important note

Add a bead of silicon down the
edge of each panel before
finally securing together.

Important note

Secure panels loosely and
adjust to achieve best fit.
Add a bead of silicon
down the edge of each
panel before finally
securing together.

  4. Roof part 1

Build the two large roof sections using the four solid roof panels by joining the panel frames together, ensure the frames are flush with each other and secure using 2 x 50mm
screws for each panel join.         Assemble the roof centre block with the internal roof capping, have the block sitting central on the cap except at the flat end where the two
components should be flush with each other. Secure the capping to the centre block using 8 x 50mm screws. Screw through the cap into the block. Insert the flat end of the
roof block assembly into the apex, secure using 2 x 50mm screws. screw up through apex frame into the roof block assembly. ensure the roof block assembly is sitting level
and securely support the other end using a prop. When the block is secure and fully supported lift on the two roof sections and secure to the walls panel using 6 x 40mm screws
per side.

50mm

50mm

50mm

50mm

Make sure the two
components are
flush at this end.

Apex P

anel

Summary of Contents for SHPOT

Page 1: ...1910mm 4 33 Potting table 1 34 Side potting table 2 35 Potting table legs 29x35x740mm 4 36 Large window glazing 750x655mm 5 37 Small window glazing 580x255mm 5 38 Large window beading 12x30x728mm 10 39 Large window beading 12x30x657mm 10 40 Small window beading 15x15x257mm 10 41 Small window beading 15x15x555mm 10 42 Roof support rails 2 Gloves Before assembly We recommend that time is taken to re...

Page 2: ...o VALIDATE the guarantee adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building Placing the building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions If the building is to sit on soil or grass it MUST be erected on pressure treated wooden 50mm x 50mm ...

Page 3: ...te Add a bead of silicon down the edge of each panel before finally securing together Important note Secure panels loosely and adjust to achieve best fit Add a bead of silicon down the edge of each panel before finally securing together 4 Roof part 1 Build the two large roof sections using the four solid roof panels by joining the panel frames together ensure the frames are flush with each other a...

Page 4: ... Position the finial centrally over the join of the two bargeboards and secure using 2 x 40mm screws 10mm Felt nail 50mm 50mm 40mm 40mm 10mm Felt nail 10mm Felt nail 10mm Felt nail Important note Have a least 25mm of felt overlapping the glazed roof panels Apex Panel 63mm Important note Attach the two roof support rails wit 2 x 50mm screws 8 Roof felt Cut the 4m felt roll into two equal parts Plac...

Page 5: ... good bead of silicon has been applied under the flap of roof felt that overlaps the glazed panels before screwing the coverstrips down Flap of roof felt overlapping glazed panels Flap of roof felt overlapping glazed panels 25mm It is recommended to drill pilot holes with a 3mm drill bit for all screws in this section 3mm Drill 25mm Important note Add a bead of silicon sealant to the underside of ...

Page 6: ... Garden Products recommend using pressure treated bearers with all buildings on any type of base Timber Information As timber is a natural material there are certain weather conditions that may affect the materials properties In times of excessive dry spells the material may lose some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there w...

Reviews: