background image

6. Barge Boards

5. Roof Boards

Important information - retain for future reference

If in doubt of any aspect regarding the assembly, use or safety of your garden building please contact us:

Help Line: (Normal Office Hours)  01829 261 121
Email: [email protected]

ROWLINSON GARDEN PRODUCTS LIMITED

Green Lane

Wardle Nr. Nantwich

Cheshire

CW5 6BN

www.rowgar.co.uk

We constantly improve the quality of our products, 

occasionally the components may differ from the 

components shown and are only correct at time 

of printing. We reserve the right to change the 

specification of our products without prior notice.

2022 © Rowlinson Garden Products Ltd

Use the two roof board space tools to 

consistent spacing of the roof boards.

Continue to adding roof boards 

up the roof. Spacing them using 

the spacer tools.

Ensure final roof 

board is flush to the 

front edge of the 

legs and roof frame.

Ensure first roof 

board is flush to the 

back edge of the 

legs and roof frame.

7

70mm

70mm

7

14

14

70mm

70mm

8

8

9

9

70mm

70mm

70mm

70mm

14

14

7    

7

Summary of Contents for Bondi BBQSHEL

Page 1: ...ws 24 Bondi Barbecue Shelter English SS574 Assembly Instructions Biocidal Products Regulation EU 528 2012 Wolmanit CX treated wood is a treated article that incorporates biocidal products copper hydroxide carbonate II and boric acid They protect wood against fungal decay rot and insect attack Keep away from food drink and animal feeding stuffs Avoid breathing dust when cutting treated wood Before ...

Page 2: ...s secure to the legs Note To set the panel height rest the panel on the two spacer blocks provided Remove the spacer block once the panel is secure to the legs Note To set the panel height rest the panel on the two spacer blocks provided Remove the spacer block once the panel is secure to the legs 70mm 2 2 1 1 12 12 12 12 50mm 50mm 70mm 4 14 14 70mm 50mm 50mm 14 14 14 14 3 4 ...

Page 3: ... structure ensure roof is flush with the top and front edge of the posts At the back of the structure ensure rear roof frame is flush with the top and back edge of the posts Roof rafters are angled at each end ensure they are all orientated the same way 50mm 50mm 20mm 11 6 6 6 6 5 5 100mm 70mm 70mm 11 11 20mm 11 100mm 50mm 50mm ...

Page 4: ...occasionally the components may differ from the components shown and are only correct at time of printing We reserve the right to change the specification of our products without prior notice 2022 Rowlinson Garden Products Ltd Use the two roof board space tools to consistent spacing of the roof boards Continue to adding roof boards up the roof Spacing them using the spacer tools Ensure final roof ...

Reviews: