Roverpet 66PR Assembly Instructions Download Page 2

                  Roverpet

   20 Kiji Dava Circle   Prescott, Arizona  86301    

800-658-5925

    

[email protected]

 

 

Page 2 of  3 

 

3.)  Insert one end of the

 

#72

CB’s into the large holes located near the ends of 

(1)

 #PR72LB. Slide the #72CB into the hole 

until about 4” is protruding through. 

 

 

 

4.)  Install the remaining 

(2)

 legs into the #PRS66 leg hole. Install one on each of the #72CB. Slide the #PRS66 onto the 

#72CB until centered on the #72CB. When installing the #PRS66, verify the legs of the #PRS66 are positioned the same 
as the legs of the #PR72LB. 

 

 

 

5.)  Install the second #PR72LB onto the two remaining ends of the #72

CB’s, using the same method as before. Make 

certain that all 4 legs installed in Step 2 are positioned in the same direction. 

 

 

6.)  Take the assembled Roverpet Puppy Rail System and lower one side of the rails into your Roverpet whelping box. Line 

up the #PR72LB connecting ends with the 2nd vertical bars of the whelping box panels. 

 
 

Note:

 Make sure the #PR72LB connecting end will not be installed on a door panel, rotate the Roverpet Puppy Rail Assembly 

90* to avoid attachment on door panel. Verify the legs will rest on the floor of your whelping box when installation is complete. 

 

 

 

2

nd

 Vertical Bars 

Reviews: