background image

Page 

of 

7

INSTALLATION PROCEDURE

1

3. Using three (3) clamps per side attach the rail to the bed, position the clamps adjacent to each of the black

adjust the rail as the outer clamps are attached)

4. Tighten the clamps using a 1/2” socket. Install the bulkhead seal to the top of the front rail of the truck bed

and cut to length.

Warning! 

Do not overtighten the clamp 

assembly. A torque wrench is not necessary. If 

preferred,  torque is apx 120 inch lbs.

Warning! 

Clamps must be checked periodi-

cally for tightness. Failure to do so could 

result in damage to you or your property.

4

1/2”

will go t

3

Stick each one of the rubber filler strips to the bed rail, adjacent to each rail spacer (black piece with 

'clamp' written on it), prior to installing the mounting rail. Tip: Lay the cover mounting rail on top of the 

truck bed rail, drain tube towards the cab, to help indicate position of the filler strips. The filler strips 

should be mounted on the lower portion of the bed rail. On the front (cab) spacer, two spacers will be 

used on either side of the metal stamping.

2

Summary of Contents for 47120580

Page 1: ...TION DO NOT OVER TORQUE A TORQUE WRENCH IS NOT NECESSARY IF PREFERRED TORQUE IS APX 120 INCH LBS Tools Required PN Part Description Qty PN Part Description Qty Components Page 1 of 7 47120580 19 Curre...

Page 2: ...e is apx 120 inch lbs Warning Clamps must be checked periodi cally for tightness Failure to do so could result in damage to you or your property 4 1 2 will go t 3 Stick each one of the rubber filler s...

Page 3: ...onneau onto the mounting rails the buckles should be to the front 6 7 Assemble the four retainer clamps slide each of them into the track on the underside of the tonneau slide into position but do not...

Page 4: ...Be sure the latches on both sides are engaging with the cover mounting rail Note If your truck is equipped with a tailgate protector you may need to slightly raise the rear of the side mounting rails...

Page 5: ...be done by placing the tube behind a bed liner through an existing hole in the bed or by drilling a 5 8 hole in the bulkhead or bed floor Note If you choose to place the tube behind your bedliner be...

Page 6: ...the cable While pulling on the cable lift the panel up and towards the cab 3 4 5 Release the strap from the stowed position by squeezing the tabs Attach the buckle at the bulk head pull the strap to t...

Page 7: ...uck always keep the cover in either the fully closed and latched position or properly bucked in the approved open position The approved open position would be the first and second panels stacked on to...

Reviews: