Section 1 Introduction
S7A S8A Manual
www.rottlermfg.com
1-1
INTRODUCTION
READ THE SAFETY CHAPTER BEFORE INSTALLING MACHINE. THOROUGHLY UNDERSTAND
ALL SAFETY ISSUES BEFORE OPERATING MACHINE.
ATTENTION OWNER/BUSINESS MANAGER
To validate the warranty on your new Rottler machine, please be sure to sign
and complete the “Installation Report” located in the Installation Chapter of this
manual.
We suggest that the new user of the S7A & S8A read the CONTROL DEFINITIONS to get an idea how
the machine operates.
The Operating Instructions chapter should be read in order to familiarize the user with the actual button
pushing sequences required to carry out a job. These chapters in the manual should be considered an
introduction. As the operators of the S7A & S8A series machines gain experience with using the different
functions of the machine, complicated setups and programs will make more sense.
The rest of the manual contains information and part number reference on fixtures, cutting tools, and
machine maintenance. The operator should read and become familiar with these areas as well.
Summary of Contents for S7A
Page 2: ......
Page 4: ......
Page 8: ...Section 1 Introduction S7A S8A Manual www rottlermfg com 1 4...
Page 36: ...Section 5 Operating Instructions S7A S8A Manual www rottlermfg com 5 7...
Page 55: ...Section 6 Maintenance S7A S8A Manual www rottlermfg com 6 17 Pneumatic Control Diagram...
Page 64: ...Section 6 Maintenance S7A S8A Manual www rottlermfg com 6 26...
Page 66: ...Section 7 Troubleshooting S7A S8A Manual www rottlermfg com 7 1...
Page 69: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 2 Pneumatic Assembly...
Page 71: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 4 Electrical Enclosure...
Page 72: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 5 Upper Housing...
Page 73: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 6 Upper Vertical Travel Belt Parts...
Page 74: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 7 Spindle Base Front Section...
Page 75: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 8 Inner Outer Spindle Assembly...
Page 76: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 9 Spindle Base Bushings...
Page 77: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 10 Spindle Base Assembly...
Page 78: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 11 Left Ballscrew Support...
Page 79: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 12 Right Ballscrew Support...
Page 80: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 13 Home and Limit Switches...
Page 81: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 14 Pendant Assembly...
Page 82: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 15 Spindle Base Cover...
Page 83: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 16 Chip Shield 14 16...
Page 84: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 17 14 Fly Cutter...
Page 85: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 18 Chip Chute...
Page 87: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 20 Riser Set...
Page 88: ...Section 8 Machine Parts S7A S8A Manual www rottlermfg com 8 21...
Page 90: ...Section 9 Options S7A S8A Manual www rottlermfg com 9 2...
Page 92: ...Section 10 Material Data Safety Sheets S7A S8A Manual www rottlermfg com 10 2...
Page 93: ...Section 10 Material Data Safety Sheets S7A S8A Manual www rottlermfg com 10 3...
Page 94: ...Section 10 Material Data Safety Sheets S7A S8A Manual www rottlermfg com 10 4...