ENGLISH
17
Table 2: Guide value table for
PE-HD
pursuant to DVS 2207 T1 (09/2005):
Pipe outer
Heating time Heating time
Positioning
Cooling time
holding total
(sec) (min)
diameter
SDR
6
– 7,4 - 11
SDR
17
(mm)
(sec)
(sec)
(sec)
16
5
4
6
2
20
5
4
6
2
25
7
4
10
2
32
8
6
10
4
40
12
6
20
4
50
18
6
20
4
63
24
8
30
6
75
30
18
8
30
6
90
40
26
8
40
6
110
50
36
10
50
8
125
60
46
10
60
8
Table 3: Guide value table for
PP
pursuant to DVS 2207 T11 (08/2008):
Pipe outer
Heating time Heating time
Positioning
Cooling time
holding total
(sec) (min)
diameter
SDR
6
– 7,4 - 11
SDR
17
– 17,6
(mm)
(sec)
(sec)
(sec)
16
5
4
6
2
20
5
4
6
2
25
7
4
10
2
32
8
6
10
4
40
12
6
20
4
50
18
6
20
4
63
24
10
8
30
6
75
30
15
8
30
6
90
40
22
8
40
6
110
50
30
10
50
8
125
60
35
10
60
8
Table 4: Guide value table for
PVDF
pursuant to DVS 2207 T15 (12/2005):
Pipe outer
min. pipe
Heating time
Positioning
Cooling time
holding total
(sec) (min)
diameter
wall thickn.
(mm)
(mm)
(sec)
(sec)
16
1,5
4
4
6
2
20
1,9
6
4
6
2
25
1,9
8
4
6
2
32
2,4
10
4
12
4
40
2,4
12
4
12
4
50
3,0
18
4
12
4
63
3,0
20
6
18
6
75
3,0
22
6
18
6
90
3,0
25
6
18
6
110
3,0
30
6
24
8
Summary of Contents for ROWELD P 125
Page 31: ...29 16 Schaltplan Wiring diagram ...
Page 35: ...NOTES 33 ...