6.1 Installation requirements
6.1.1
The installation site should be clean, dry and level, at a suitable position determined by the
customer
.
6.1.2
The installation site should have a single 220v/240v AC supply via a 3-pin socket (unless
rated for 110v operation)
.
6.1.3
Before installing and using the machine it is recommended that staff or operators read this
manual and view the training videos installed on the USB Memory Stick provided.
6.1.4
Installation should be effected within the following hierarchy:
•
National legalisation requirements.
•
Corporate regulations: installation and safety standards and procedures.
•
The installation description given this manual.
6.1.5
No specific materials are required for installation.
6.1.6
Tools may be required to change service connections to ensure that they are compatible
and correctly fitted.
8
6.2 Installation procedures
6.2.1
Site the machine in a suitable position in relation to the production line.
6.2.2
Ensure that the machine is sited on a horizontal surface and cannot slide or roll.
6.2.3
Connect the machine to the mains AC supply.
With the power cord supplied
6. Installation
6.3 Inspection and testing procedures upon installation
6.3.1
Check machine supplies have been connected and their function and safety are validated.
6.3.2
Ensure that moving parts are free from obstruction, and any packaging has been
removed, especially around the printer..
6.3.3
Switch on the mains power switch to both the feeder and the printer.
6.3.5
Pressing the green start button on the control panel at this point will start the machine
running. Pressing the red ‘mushroom’ stop button will stop the machine.