background image

 

 

Operating & Maintenance 

Manual 

Rotech RF-Lite Version 1.3 

2016 © Copyright Rotech machines Limited 

Summary of Contents for RF LITE Series

Page 1: ...Operating Maintenance Manual Rotech RF Lite Version 1 3 2016 Copyright Rotech machines Limited...

Page 2: ...fety information 3 4 Transportation 6 5 Assembly 7 6 Installation 8 7 Decommissioning and disposal 10 8 Operation 11 9 Maintenance 17 10 Provision of spares in service support and guarantees 18 11 RF...

Page 3: ...formation on the printer 1 2 Important notes 1 2 1 The purpose of this manual is to provide information only Every effort has been made to ensure the accuracy of the contents of this manual However Ro...

Page 4: ...t has the ability to print onto the product surface After this process the product continues to the end of the conveyor where it is deposited into a catcher tray 2 5 Description of products the machin...

Page 5: ...e national and local health and safety legislation in the country of use 3 1 6 If in doubt do not take any personal risks 3 1 7 Only trained personnel should be allowed to work with the machine during...

Page 6: ...y measures beyond those detailed in this manual are not required for safe operation of the equipment 3 7 4 The customer should ensure that there is no ingress or solid liquid or gaseous contaminant th...

Page 7: ...a residual risk to users of the machine The residual risks are considered to be low 3 11 2 The loading and unloading of the machine during operation can be considered as a repetitive action The custo...

Page 8: ...achine should be sited on a level floor of sufficient strength to support it 4 1 3 It is important to ensure that the machine is level about both axes 4 1 4 The contact points between any lifting devi...

Page 9: ...catcher tray 7 The catcher tray will have been removed from the machine for transportation It can be re fitted by simply locating it on the two mounting studs in the uprights at the end of the machine...

Page 10: ...6 1 6 Tools may be required to change service connections to ensure that they are compatible and correctly fitted 8 6 2 Installation procedures 6 2 1 Site the machine in a suitable position in relatio...

Page 11: ...9 6 4 Commissioning plans and procedures 6 4 1 Once installation has been successfully completed the machine is ready to run 6 Installation...

Page 12: ...ech Machines Limited for disposal The following conditions apply Laws codes of practice applicable govern conditions for return and disposal at the time of the first delivery of the machine to the cus...

Page 13: ...er 5 Stand Optional Extra 6 Gating Finger Adjustment Locking Lever 7 Outfeed Conveyor Adjustment 8 Product Gating Finger 9 Catcher Guide 10 Samples 11 Catcher Tray 12 Outfeed Product Guide 13 Outfeed...

Page 14: ...ase the grip and anti clockwise to decrease the grip I revolution of the Adjust ment Knob will adjust the Gating Finger height up or down by 0 25mm 6 When the Gating Finger is set tighten the Clamp Le...

Page 15: ...at it is in line with the print area 4 Clamp the printer in position 1 With the feeder running on slow speed the position of the outfeed conveyor belts can be ad justed Rotate the adjustment screw kno...

Page 16: ...lease the adjustment knob and slide the Infeed Guide forward to assist the product feed Re tighten the knob when in position and the product feeds correctly 1 Loosen the locking screw to move the catc...

Page 17: ...firmly and prevents it from slipping while being transported and printed Two outfeed guide plates are fitted on top of the conveyor to control the product before printing and before dropping into the...

Page 18: ...op the conveyor until all of the product has been collected in the catcher Setting the speed Adjust the speed of the machine by selecting either low or high speed using the speed selector switch Pleas...

Page 19: ...ed out at the end of each working week Before commencing these operations ensure the isolator is turned to the OFF position a Feeder roller cleaning 1 Spray a small amount of Platen Cleaner onto a non...

Page 20: ...g Rotech Machines Limited or their authorised distributor agent 10 3 Guarantees This machine is guaranteed to be free from defects for a twelve month period The guarantee excludes consumable items suc...

Page 21: ...lay control DPDT Conveyor control 1 Mechanical system Stk ref Description Function Req qty 7030 Timing belt T5 185L Motor to hex shaft drive 1 7031 Timing belt T5 250L Hex shaft to gating roller drive...

Page 22: ...elay Pin 1 Relay Pin 3 Relay Pin 6 Relay Pin 7 Relay Pin 4 Relay Coil 8 6 7 4 5 1 Relay Pin 2 Relay Pin 5 2 3 L N E MAINS OUT CONNECTOR Max 1 5A 1 2 3 5 4 14 13 12 11 10 9 6 7 8 SPEED CONTROL BOARD 8...

Page 23: ...hers Iss A 9 March 16 6 180 440 5 R1 8 X1 X2 4 3 2 1 RS 267 4164 Red Spade Connector RS 688 1206 Red Fork Connector RS 239 4183 Yellow Fork Connector RS 157 1222 Red Ferrule Control Panel Switch Arran...

Page 24: ......

Reviews: