d
050
27
.f
m
MAINTENANCE MANUAL
BRP-Powertrain
Effectivity: 912 i Series
Edition 1/Rev. 0
05-20-00
page 13
January 01/2012
5.1)
Maintenance Schedule
General note
Perform the following maintenance tasks at the intervals shown in the
maintenance check list. See
25 hr. check.
NOTE:
If the points 1-3 are correct of the check list then to continue
with the maintenance schedule.
If one of the points 1-3 is not fulfilled, the engine must be
checked and repaired in accordance with the BRP-Powertrain
instructions for continued airworthiness.
Legend:
X
=
do the task
blank
=
no task required
Points of Inspection
Interval
Operating hours
Chapter
Reference
Signature
as
indicated
100 hr.
1.) Visual inspection of the engine
General visual inspection of the engine for damage or
abnormalities.
Check cooling air duct and cooling fins of the cylin-
ders for obstruction, cracks, wear and good condition.
Take note of changes caused by temperature influ-
ence.
recommended
50 hr.
X
12-20-00
sec. 2)
Visual inspection of the ECU and FUSE BOX.
X
Inspect all coolant hoses for damage, including leak-
age, hardening from heat, porosity, loose connec-
tions and secure attachment. Verify routing is free of
kinks and restrictions.
X
12-20-00
sec. 3)
Carry out visual inspection of leakage bore at the
base of the water pump for signs of leakage.
X
12-20-00
sec. 3)
Inspect the expansion tank for damage and abnor-
malities. Check coolant level, replenish as necessary.
Inspect radiator cap.
Inspect protection rubber on expansion tank base for
correct fit.
X
12-20-00
sec. 10.4)
Inspect the overflow bottle for damage and abnormal-
ities.
Verify coolant level, replenish as necessary.
Inspect line from expansion tank to overflow bottle for
damage, leakage and clear passage.
Inspect venting bore in cap of overflow bottle for clear
passage.
X
12-20-00
sec. 10.5)
Summary of Contents for 912 iS Sport
Page 1: ...AIRCRAFT ENGINES ref no MML 912 i part no 898742...
Page 157: ......
Page 158: ...AIRCRAFT ENGINES www cps parts com 800 247 9653...