background image

Assembly Instructions for EZPRO 2/3/5 Unit

1. Carefully remove all parts from packaging:

•  1-PRO Stand
•  1-PRO Base 
•  1-PRO Tray 
•  1.5mm Allen Wrench 
•  2, 3 or 5 PRO Containers

I.    Pro Lid, Stainless Steel (1)
II.    6WR PRO Silicon Paddle Wheel (2)
III.    Regular Nozzle (3)
IV.    Container (4)
V.    Name Tag (5)
VI.    PRO Handle (6)
VII.   Mini 1.5mm Screw for Handle (7)
VIII.  Plastic Pin (8)

2. Remove all PRO Containers (4) from individual 

packaging and foam protection

3. Remove all PRO Lids (1) from cardboard insert 

before discarding container packaging

4. Insert back of container onto PRO Stand (A), making 

sure it locks into place and the container is secure

5. Repeat Step 4 for the remaining containers
6. Place PRO Tray (C) on PRO Base (B) 
7. Place PRO Base (B) on PRO Stand (A)
8. Fill containers with desired dry product
9. Place all lids on each corresponding container

10. Dispense as you please!

* IMPORTANT NOTE, PLEASE READ:

Make sure to use long side of Allen wrench to tighten screw. When tightening screw, turn handle so screw hole is facing the bottom 

of container towards nozzle for easy access. 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(D)

XI. Pro Fresh Lid (9)

(9)

Reviews: