Synergy 100 Installation Guide (v16.10-S100)
Installation • 2–15
3. At the rear of the shelf, there are two stiffening brackets which have been attached with
one screw and a nut each. The
nuts
must be removed for the next step. Refer to the
diagram below.
Rear View of Sliding Shelf
4. Attach the two adjustable rear brackets to the rack, with the screw from the stiffening
bracket extending through the adjustment slots. Please note that we do not supply the
screws for the bracket-to-rack installation.
5. Replace the nuts that you removed in step 3, and tighten.
6. Insert the #8 x 3/8 screws (supplied) through the second hole in the stiffening brackets
and through the slots in the adjustable brackets. Install the nuts over the screws and
tighten.
7. From the front of the rack frame, set the Synergy 100 control panel on top of the shelf,
with the four holes on the bottom of the control panel lining up with the four holes on the
shelf.
8. Insert the four #8 x ¾ screws (supplied) up through the
underside
of the shelf into the
control panel tub, and tighten.
9. This completes the installation procedure. You can now slide the shelf into the rack and
secure it by turning the locking device on the front panel. In addition, the rear lock-down
tab (as illustrated in “
” on page 2-15) can be rotated
downward and tightened for added security during transportation of your unit.
.This completes the control panel installation.
Note
If you have purchased the Synergy 100 panel to interface with your
existing Synergy 1 frame, you may require two additional
de-serializers to ensure full three-keyer functionality. For more
information, please contact
Ross Video Technical Support
.
Stiffening Brackets
#8 x 3/8" Screws
Adjustable Rear Brackets
Rear Lock-down Tab
Attach to Back Rail of Frame
Holes for #8 x 3/4 Screws
Summary of Contents for Synergy 100
Page 1: ...Ross Video Limited Installation Guide Software Issue 16 10 S100...
Page 10: ......
Page 16: ...vi Contents Synergy 100 Installation Guide v16 10 S100...
Page 66: ...2 32 Installation Synergy 100 Installation Guide v16 10 S100...
Page 88: ...5 6 Using the Menu System Synergy 100 Installation Guide v16 10 S100...
Page 100: ...6 12 BNC Configuration and Check Synergy 100 Installation Guide v16 10 S100...
Page 134: ...7 34 Communication Setup Synergy 100 Installation Guide v16 10 S100...
Page 170: ...8 36 Additional Installation Setups Synergy 100 Installation Guide v16 10 S100...
Page 186: ...9 16 Completing Setup Synergy 100 Installation Guide v16 10 S100...
Page 208: ...10 22 Appendix A Specifications Synergy 100 Installation Guide v16 10 S100...
Page 216: ...11 8 Appendix B Hardware Options Synergy 100 Installation Guide v16 10 S100...
Page 234: ...GL 4 Glossary of Terms Synergy 100 Installation Guide v16 10 S100...
Page 246: ...IX 12 Index Synergy 100 Installation Guide v16 10 S100...