Ross 4800DR-327 Installation Manual Download Page 8

 7 • Control Panel Configuration

Control Panel Configuration

When the Vision control panel is powered on after replacing the CF, you must 
enter the network addresses for the control panel and frame, and assign the 
control panel modules to the control panel rows.

Network Setup

The Network setting for the switcher are stored on the CF in the Vision control 
panel. When the new CF is installed, this information must be re-entered to 
establish communication between the control panel and frame.

Use the following procedure to restore the network information of the control 
panel and frame:

1.

Power on the Vision control panel. Refer to your switcher 
documentation for information on powering on the control panel.

Note

 — If the Touchscreen of the Vision control panel is blank 

when the control panel restarts, ensure that the switcher has 
been upgraded to v8.2E software. Perform the upgrade again if 
necessary. You may have to point the frame to the default IP 
address of the Vision control panel (192.168.1.2) to perform the 
upgrade.

2.

Place the control panel into diagnostic mode by pressing 

HOME

 three 

times quickly. 

3.

Navigate to the 

Network Setup Menu

 as follows:

Press 

HOME

 

B

More

 

B

Setup

 

B

More

 

B

Network 

Setup

.

4.

Enter the network addresses for the control panel and frame that you 
recorded earlier (

Table 1

).

5.

Press 

Save

 on the 

Network Setup Menu

 to store the new network 

setup information.

6.

Press 

Yes

 on the 

Restart Confirmation Screen

 to restart the 

switcher. A screen is displayed, stating that the frame cannot be 
located, press 

ok

 to continue.

7.

When the switcher has restarted, communication between the control 
panel and frame is restored.

This completes the procedure for restoring the network information of the 
control panel and frame. Next, you must set up the modules on the control panel.

Summary of Contents for 4800DR-327

Page 1: ...Ross Video Limited CompactFlash Installation Guide V I S I O N ...

Page 2: ...software is prohibited Notice The material in this guide is furnished for informational use only It is subject to change without notice and should not be construed as commitment by Ross Video Limited Ross Video Limited assumes no responsibility or liability for errors or inaccuracies that may appear in this guide Trademarks is a registered trademark of Ross Video Limited Ross ROSS ROSS and MLE are...

Page 3: ...me to dissipate static charge before removing boards from the frame and exercise proper grounding precautions when working on circuit boards Environmental Information The equipment that you purchased required the extraction and use of natural resources for its production It may contain hazardous substances that could impact health and the environment To avoid the potential release of those substan...

Page 4: ...ts Package Contents The contents of a CompactFlash replacement kit is listed below If any items are missing or damaged contact Ross Video Technical Support Qty Part Item 1 726 165R 4GB CompactFlash with Vision software ...

Page 5: ...ettings Before you replace the CF you must navigate to the Network Setup Menu to record the network address of the control panel and the frame After you install the new CF you will use this information to re establish communications between the control panel and the frame Use the following procedure to record the network address of the control panel and frame 1 Navigate to the Network Setup Menu a...

Page 6: ...l panel Warning Hazardous Voltage Hazardous voltages are present in the control panel as long as any of the power supplies are connected to the AC power 3 Lift up on the control panel lid to gain access to the control panel tub 4 Identify the CompactFlash Access Plate on the front of the Control Panel CPU Module Figure 1 Figure 1 CompactFlash Access Plate Control Panel CPU Module 5 Remove the scre...

Page 7: ...own and slide it into the empty CF Slot until the Ejector Button pops out Figure 4 Figure 4 CompactFlash Insertion 9 Replace the CompactFlash Access Plate and install the screws in either side of the plate 10 Close the control panel lid and reconnect the power to the control panel This completes the procedure for replacing the CF in the Vision control panel Next you must power on the control panel...

Page 8: ...starts ensure that the switcher has been upgraded to v8 2E software Perform the upgrade again if necessary You may have to point the frame to the default IP address of the Vision control panel 192 168 1 2 to perform the upgrade 2 Place the control panel into diagnostic mode by pressing HOME three times quickly 3 Navigate to the Network Setup Menu as follows Press HOME B More B Setup B More B Netwo...

Page 9: ...es to control panel rows is stored on the CF When the new CF is installed the modules on the control panel must be re assigned Refer to your Vision Engineering Manual for information on upgrading your Panel Module Controllers PMCs and assigning the modules to a panel row ...

Page 10: ...9 Control Panel Configuration Notes ...

Page 11: ...Control Panel Configuration 10 Notes ...

Page 12: ...Company information Related products and full product lines On line catalog News Testimonials PHONE General Business Office and Technical Support 613 652 4886 After Hours Emergency 613 349 0006 Fax 613 652 4425 E MAIL General Information solutions rossvideo com Technical Support techsupport rossvideo com POSTAL SERVICE Ross Video Limited 8 John Street Iroquois Ontario Canada K0E 1K0 Ross Video Inc...

Reviews: