![Ross 4800DR-327 Installation Manual Download Page 8](http://html1.mh-extra.com/html/ross/4800dr-327/4800dr-327_installation-manual_1488996008.webp)
7 • Control Panel Configuration
Control Panel Configuration
When the Vision control panel is powered on after replacing the CF, you must
enter the network addresses for the control panel and frame, and assign the
control panel modules to the control panel rows.
Network Setup
The Network setting for the switcher are stored on the CF in the Vision control
panel. When the new CF is installed, this information must be re-entered to
establish communication between the control panel and frame.
Use the following procedure to restore the network information of the control
panel and frame:
1.
Power on the Vision control panel. Refer to your switcher
documentation for information on powering on the control panel.
Note
— If the Touchscreen of the Vision control panel is blank
when the control panel restarts, ensure that the switcher has
been upgraded to v8.2E software. Perform the upgrade again if
necessary. You may have to point the frame to the default IP
address of the Vision control panel (192.168.1.2) to perform the
upgrade.
2.
Place the control panel into diagnostic mode by pressing
HOME
three
times quickly.
3.
Navigate to the
Network Setup Menu
as follows:
•
Press
HOME
B
More
B
Setup
B
More
B
Network
Setup
.
4.
Enter the network addresses for the control panel and frame that you
recorded earlier (
5.
Press
Save
on the
Network Setup Menu
to store the new network
setup information.
6.
Press
Yes
on the
Restart Confirmation Screen
to restart the
switcher. A screen is displayed, stating that the frame cannot be
located, press
ok
to continue.
7.
When the switcher has restarted, communication between the control
panel and frame is restored.
This completes the procedure for restoring the network information of the
control panel and frame. Next, you must set up the modules on the control panel.