19

 

  The hygiene inspection at the unit has to be made according to the following intervals: 

- after startup 
- every 3 years (devices without moisturization) 

 

  The periodical hygiene inspection is necessary to reveal hygiene deficiencies at an early stage 

and to rectify them with appropriate action. 

 

  The results of the inspection of the hygienic condition, the cleaning and disinfection have to be 

documented in the appropriate way (e.g. operations diary). 

 

  The relevant regulation for the hygienic requirements of the RLT-units is VDI 6022. It is the 

guideline for the current instructions. All work has to be carried out according to the latest 
version of the VDI guideline. 
 

Please find instructions for the cleaning and hygiene inspection of each functional part of the device 
below. 

 

7.3 Maintenance and Cleaning of the housing and control 
 

Please keep to the following instructions for the regular maintenance work (quarterly 
intervals: 
 

  Check the seals of the operation doors and replace them if necessary

 

 

  Check the function of the double guide at the fan (discharge side)  

 

  Check the panels for damages and corrosion 

 

  Flexible parts, such as hinges, should  be treated with an appropriate lubricant spray

 

 

  Remove severe loose dirt with a vacuum cleaner

 

 

  Remove other dirt with a moist cloth

 

 

  The water or cleaning agent should have a neutral ph-value (6-8)

 

 

 

Maintenance of the control and terminal boxes 

(only by an electrician) 

Every       

3 months 

If 

necessary 

Hygiene 

inspection 

Check the electrical equipment, cables and connections for dirt 
and apparent damages and replace them if necessary 

 

 

Dry cleaning of the control, do not use water 

 

 

Summary of Contents for SupraBox Comfort 1100V

Page 1: ...erg Ventilatoren GmbH Maybachstra e 1 74653 K nzelsau Gaisbach Tel 49 0 7940 142 0 Fax 49 0 7940 142 125 Email info rosenberg gmbh com www rosenberg gmbh com EN Betriebsanleitung Operating instruction...

Page 2: ...of the device 14 5 2 Assembly 14 5 3 Connection of the ventilation ducts to the unit 15 5 4 Electric Installation 15 5 5 Connection of the condensate exhaust air and overflow pipes 15 6 Initial Setup...

Page 3: ...A 03 12 A SupraBox 1 2 1 General Safety Instructions 1 1 Warnings regarding health and safety The following icons inform about certain hazards or safe use Attention Danger Safety Advice Hazard by elec...

Page 4: ...the technical data specification or can be found on the name plates One single instance of the prescribed power limit being exceeded will inevitably cause damage to the built in components which resul...

Page 5: ...n with gradient all around Unit is installed on a base frame with four adjustable feet for balancing uneven bottoms as well as for the outside installation Adjustment range 45 70 mm The compact housin...

Page 6: ...perating point 2 x 225 W 2 x 320 W 2 x 475 W 2 x 780 W SFP Value in the operating point 1013 Ws m 1047 Ws m 1140 Ws m 1404 Ws m SFP class in the l operating point SFP2 SFP2 SFP3 SFP3 Heat recovery Eff...

Page 7: ...haust air M5 7 Condensate pan 2 Panel filter incoming air F7 8 Exhaust air with EC Motor 3 Adjustable rounded base 9 Supply fan with EC Motor 4 Bypass flap 10 Control box 5 Maintenance pan 11 Main bre...

Page 8: ...Operation and Maintenance Manual for Rosenberg Compact Ventilation appliance series SupraBox Comfort BA 114 AA 03 12 A SupraBox 1 7 2 3 Device drawings Suprabox 800 V Suprabox 1100 V...

Page 9: ...Operation and Maintenance Manual for Rosenberg Compact Ventilation appliance series SupraBox Comfort BA 114 AA 03 12 A SupraBox 1 8 Suprabox 1500 V Suprabox 2000 V...

Page 10: ...ir or gaseous media to the criteria below The compact ventilation appliance is suitable for the conveyance of Clean air low dust or low greasy air Slightly aggressive gases or fumes consult the factor...

Page 11: ...mpleteness of the scope of delivery must be checked in accordance with the freight documents Missing parts or damages must be noted on the freight documents and signed by the driver of the transport v...

Page 12: ...ning of the responsible staff according to the accident prevention regulation in Germany BGV D27 Flurf rderfahrzeuge The loading capacity of the material handling equipment must always be checked befo...

Page 13: ...1 or round slings according to EN1492 2 It is forbidden to use chain slings or slinging ropes for the direct load attachment The slings should not have an inclination angle of more than 60 Please not...

Page 14: ...y be removed in order to avoid condensation water Open pallets must be covered by tarps Protect the functional parts against pollution e g chips stones wires etc Also the weatherproof functional parts...

Page 15: ...of the installation area may not exceed a max of 2 Choose an installation space with an unobstructed condensate drain and water trap as well as a sufficient gradient of the condensate line The height...

Page 16: ...clusively be made by a licensed electrician according to the VDE regulations The connection must be made exactly according to the wire diagram and the face plan Check all screw joints before startup o...

Page 17: ...nce series SupraBox Comfort BA 114 AA 03 12 A SupraBox 1 16 Do not connect the spout to the sewage system Alternatively a vacuum trap with non return ball can be used but make sure that there is a suc...

Page 18: ...Remove a possible protective film Optical inspection of the unit gaskets for damage Re adjust the hinges of the maintenance doors Close all doors Operational check of the fans Pressure control of the...

Page 19: ...ure that it will not be switched on unintentionally This step disconnects the compact unit from the mains with all poles Be aware that the control box will still be hot For maintenance at the control...

Page 20: ...f the VDI guideline Please find instructions for the cleaning and hygiene inspection of each functional part of the device below 7 3 Maintenance and Cleaning of the housing and control Please keep to...

Page 21: ...he startup of the fans check the heat recovery the heater and the corresponding frost protection if the outside temperature is less than 5 C and operate them if necessary in order to prevent the unit...

Page 22: ...ion during the first four to twelve weeks regarding the following points Balance unusual sounds vibrations Fastening of the fan the motor and the vibration absorbers The fan as a fast rotating device...

Page 23: ...our allen head screws at the chassis rails Pay attention that the wiring will first be disconnected For more thorough cleaning also the exhaust fan can be unlocked and removed at the four points of th...

Page 24: ...he sheet of water should always follow the disc set from top to bottom Clean the module chamber thoroughly Completely remove the dirty water Lock the maintenance pan X Check the condensate and mainten...

Page 25: ...re assembly During the filter change check the seal and replace it if necessary 7 6 3 Maintenance and Cleaning The recommended final resistance for this filter version is 200 PA Always replace panel...

Reviews: