Quick Installation Guide
00825-0100-4825, Rev CA
February 2006
Rosemount 248
S
TEP
2
CONTINUED
...
Typical North and South American Installation
Head Mount Transmitter with Threaded Sensor
1. Attach the thermowell to the pipe or process container wall. Install
and tighten thermowells before applying process pressure.
2. Attach necessary extension nipples and adapters to the
thermowell. Seal the nipple and adapter threads with silicone tape.
3. Screw the sensor into the thermowell. Install drain seals if required
for severe environments or to satisfy code requirements.
4. Pull the sensor wiring leads through the universal head and
transmitter. Mount the transmitter in the universal head by
threading the transmitter mounting screws into the universal head
mounting holes.
5. Mount the transmitter-sensor assembly into the thermowell. Seal
adapter threads with silicone tape.
6. Install conduit for field wiring to the conduit entry of the universal
head. Seal conduit threads with silicone tape.
7. Pull the field wiring leads through the conduit into the universal
head. Attach the sensor and power leads to the transmitter. Avoid
contact with other terminals.
8. Install and tighten the universal head cover. Enclosure covers must
be fully engaged to meet explosion-proof requirements.
A = Threaded Thermowell
D = Universal Head
B = Threaded Style Sensor
E = Conduit Entry
C = Standard Extension
A
B
C
D
E
24
8\
00
0a
04
a.
ep
s
00825-0100-4825.fm Page 5 Wednesday, February 8, 2006 1:53 PM