background image

Wood Case

4

Step 4

Attaching to the wall

Fasten to the wall through the back cross pieces using #8x3 “ screws and 

using a level to make sure rack is mounted square on the wall. Make sure 

back cross piece has    ” dia pilot holes drilled before screwing to wall.

For a professional looking  job you can use a nail set to indent the nail 

heads and wood filler to fill in the nail holes on the front cleats, baseboard 

and crown moulding. Give the part that was filled a light sanding with 180 

grit sandpaper.

3

32

Step 3

Attaching 

FRONT

 cross pieces and spacers.

Nail the cross pieces under the 2nd, 3rd, 4th, 5th and 6th 

cleat starting from the bottom. Nail the spacers on the 

1st and 7th support cleat as shown.

Install spacers on 1st and 7th 

support cleat as shown

Install cross pieces on support 

cleats as shown.

 

 

Crown moulding 

attached to top of rack

 

1

2

  1

 

 

baseboard attached 

to bottom of rack

 

1

4

  3

Apr/23/2012

Toll Free: 1-888-253-6807 

www.RosehillWineCellars.com

6ft Premier Cru

Kit Rack

Summary of Contents for 6ft Premier Cru Kit Rack

Page 1: ...ts have been ordered please assemble all boxes by units to ensure that specific unit parts are not intermixed with other units 3 It is highly recommended to drill dia pilot holes on back cross pieces for screws before attaching to wall 3 32 8x3 Assembly Instructions 6Ft Tools Needed Hammer Pneumatic Brad Nailer Power drill Level Power miter saw Preferred pilot drill Nail Set Wood filler Optional 1...

Page 2: ...od Case 2 1pc Right end ladder 3 4 72 1pc Left end ladder 3 4 72 11 pcs Spacers 10 pcs Cross piece Crown Baseboard Apr 23 2012 Toll Free 1 888 253 6807 www RosehillWineCellars com 6ft Premier Cru Kit Rack ...

Page 3: ...t cleat 2nd support cleat 3rd support cleat 4th support cleat 5th support cleat 6th support cleat 7th support cleat First cleat is located from the bottom of the ladder 3 4 1 Install spacers on 1st and 7th support cleat as shown Install cross pieces on support cleats as shown Step 2 Attaching middle spacers Place each spacer into middle support cleat slots and nail from the outside Apr 23 2012 Tol...

Page 4: ...t cleats baseboard and crown moulding Give the part that was filled a light sanding with 180 grit sandpaper 3 32 Step 3 Attaching FRONT cross pieces and spacers Nail the cross pieces under the 2nd 3rd 4th 5th and 6th cleat starting from the bottom Nail the spacers on the 1st and 7th support cleat as shown Install spacers on 1st and 7th support cleat as shown Install cross pieces on support cleats ...

Reviews: