background image

35 Congress Street, Salem, MA 01970

 Tel# 1- 800 631-9707  Fax# 1-800-560-2890

e-mail:[email protected]

Parts

 Instruction Sheet

Step 1

Insert corner brackets into split rails
and into rail opposite split rail. Split
rail side is made up of two separate
pieces. 

Fig. 1

Note:

  

Corner bracket tension tabs

must face toward inside of frame.

Step 2

Finish assembling frame as shown in

Fig. 2 

by sliding sides together in the

order shown.

Step 3

Insert hangers into upper portion of
slatwall.  Hangers will rest on lower
portion of slatwall.  

Fig. 3

Note: 

To ensure that the frame hangs

level use two hangers placed an equal
distance in from each side of the frame.

Step 4

Place the EconoFrame on the hangers
using the bottom channel of the top
Econo rail. 

Fig. 4

Step 5

Insert poster.

 Fig 5

Instructions for Hanging

Incept-3.6.02

The EconoFrame™ is a trademark of Rose Displays, Ltd. Neither the
manufacturer nor any sales agent may be held liable for injury, loss or
damage resulting from the use of these products.
Part #02INSEconoFrameSlatwall

 EconoFrame

 Rails 12EF-100

 EconoFrame

Split Rails

 Corner

Brackets

EconoFrame

TM

Figure 1

Figure 5

Figure 2

split rails

Figure 3

Figure 4

Slatwall

Hangers

06-6068

solid rail

solid rail

split rails

Reviews: