7-4
Rosco Maximizer 3B Asphalt Distributor
Maintenance
Routine Maintenance
General Information
Maintenance must be a planned program that
includes periodic machine inspection and lubrication
procedures, (
Table 7-1. Maintenance Intervals Chart
).
The maintenance program must be done based on
the machine’s “Operating Hours” recorded on the
hourmeter, or on a “Periodic Schedule” which is done at
daily, weekly, monthly or yearly intervals.
SYSTEM
ITEM
3 Hours
Twice Daily
8 Hours
Daily
20 Hours
Weekly
80 Hours
Monthly
250 Hours
Semi-annually
400 Hours
Annually
C = Check, CL = Clean, L = Lubricate, R = Replace, T = Tighten
Spraybar
Hydraulic Cylinders
CL
Nozzles, adjust alignment if necessary
C
Hardware, tighten if necessary
C
Spraybar, Extension & Pivot Point Gaskets & Washers
R
Truck
Truck, service per Truck Operator’s Manual
C
Wash Machine
CL
Radar Horn Face Cover
CL
Air System
C
Engine
Coolant Level
C
Engine Oil Level
C
Fuel Level
C
General Information
This section gives the necessary procedures for routine
and general maintenance on the Rosco Maximizer 3B
Asphalt Distributor.
NOTE: By following a careful service and maintenance
program for your Asphalt Distributor, you will
insure many years of trouble free operation.
Follow all safety precautions in this
manual.
Table 7-1. Maintenance Intervals Chart (continued)
Return to
Last Viewed