background image

WALL MOUNT

CEILING/FLOOR MOUNT

INSIDE MOUNT

Page. 4

Skyline Bottom Up

 

Installation

 

Manual | October 2018

2018 ©Copyright All Rights Reserved Rollease Acmeda

BRACKETS

STEP 1. - ATTACH BRACKETS TO WALL/CEILING

SECTION B 

| INSTALLATION

STEP 2. - ENSURE STRAIGHT ALIGNMENT

Ensure brackets are in line.

Shade Width

Shade Dr

op

Top Bracket

Bottom Bracket

www.shadesbymatiss.com | T. 800 493 2040  | email: [email protected]

Summary of Contents for SKYLINE BOTTOM UP

Page 1: ...Skyline Bottom Up INSTALLATION MANUAL SKYLINE BOTTOM UP INSTALLATION MANUAL www shadesbymatiss com T 800 493 2040 email info shadesbymatiss com ...

Page 2: ...assumes no liability whatsoever for any damages incurred by you resulting from errors in or omissions from the information included herein Rollease Acmeda reserves the right to make changes without further notice to any products to improve reliability function or design COPYRIGHT COPYRIGHT ROLLEASE ACMEDA All rights are reserved No part of this document may be reproduced or utilised in any means b...

Page 3: ...D ASSEMBLY PARTS 1 1 2 2 2 2 3 7 3 3 6 3 5 4 SYSTEM INDEX 1 Skyline Fascia 2 Skyline Bracket 3 Skyline Bracket Cover 4 Top Tube Control Assembly 5 Bottom Tube Rail Assembly 6 Skyline Chain Diverter 3 Fascia Brackets only clutch control option only 7 Skyline Adaptor www shadesbymatiss com T 800 493 2040 email info shadesbymatiss com ...

Page 4: ...8 2018 Copyright All Rights Reserved Rollease Acmeda BRACKETS STEP 1 ATTACH BRACKETS TO WALL CEILING SECTION B INSTALLATION STEP 2 ENSURE STRAIGHT ALIGNMENT Ensure brackets are in line Shade Width Shade Drop Top Bracket Bottom Bracket www shadesbymatiss com T 800 493 2040 email info shadesbymatiss com ...

Page 5: ...s are locked to the bracket SECTION B INSTALLATION STEP 2 ATTACH BOTTOM ASSEMBLY STEP 3 ATTACH CORD Attach bottom assembly to the bottom brackets spring side first Wrench is used to keep tension in the spring while installing the bottom assembly to brackets Attach cord to the spools by tying a knot TOP ASSEMBLY BOTTOM ASSEMBLY STEP 1 LOCK CONTROL HOOKS TO THE BRACKET Swing the Pin End into the bra...

Page 6: ...served Rollease Acmeda COVERS SECTION B INSTALLATION STEP 6 ATTACH FASCIA AND BRACKET COVERS STEP 5 ATTACH RAIL SEAL STEP 4 ADJUST CORD GUIDES Adjust the cord guides so that the cords are vertical Cut rail seal in 2 places to suit cord location www shadesbymatiss com T 800 493 2040 email info shadesbymatiss com ...

Page 7: ...ll bottom tube 2b Top Booster Pre turns too low if applicable Increase top booster pre turns 1 Lower shade 2 Remove top tube 3 Apply additional pre turns 4 Re install top tube 3 Heavy when lowering the shade 3a Top Booster Pre turns too high if applicable Reduce top booster pre turns 1 Lower shade 2 Remove top tube 3 Remove pre turns 4 Re install top tube 4 Poor visual appearance of fabric 4a Shad...

Reviews: