
ASSEMBLY INSTRUCTIONS (CONT.)
13
4. Join the three Round Silver Tubes together-swaged ends fit into one another and lock forming one
Assembled Tube.
7. Insert square end of Pipe Insert Bracket into one open end of Lower Support Tube. Place circular
end of Bracket into Assembled Tube/Rolbak Net Header below. Lock into place with Locking Pin.
5. Slide Assembled Tube through the opening at the top of the Rolbak Net Header.
(PG. 14)
(PG. 15)
PART 1 - ATTACHING THE ROLBAK NET |
METHOD C - SADDLE BRACKET
Summary of Contents for NGD2118
Page 1: ...NGD2118 ASSEMBLY INSTRUCTIONS ...
Page 3: ...WARNINGS ...
Page 4: ...TABLE OF CONTENTS 5 6 9 12 14 15 16 17 ...
Page 5: ...PARTS IDENTIFIER NOT TO SCALE 5 ...
Page 14: ...ASSEMBLY INSTRUCTIONS CONT 14 PG 16 PART 2 SECURING THE NET BASE METHOD A SAND BAG ...
Page 15: ...ASSEMBLY INSTRUCTIONS CONT 15 PG 16 PART 2 SECURING THE NET BASE METHOD B WATER BAG ...