ALL DESIGN CONCEPTS ARE INTELLECTUAL PROPERTY OF ROLACASE AND ARE NOT TO BE COPIED, DISTRIBUTED OR COMMUNICATED TO UNAUTHORISED PARTIES
FOR TECHNICAL SUPPORT CALL: 1 (857) 334 0300 / E-MAIL: [email protected] / WEB: www.rolacase.com
ATTENTION: PLEASE READ ALL INSTRUCTIONS BEFORE ASSEMBLING/INSTALLING THIS PRODUCT
ANY ALTERATIONS, UNINTENDED OR UNAPPROVED WORK/USE OF THIS PRODUCT COULD CREATE A
HAZARDOUS CONDITION THAT CAN CAUSE DEATH, PERSONAL INJURY OR PROPERTY DAMAGE.
WARNING
ATTENTION
IMAGES USED IN THIS GUIDE MAY VARY SLIGHTLY DEPENDING ON YOUR MODEL
REV 1.1.1
FFor fur
or furthther details please go
er details please go
tto www
o www.r.rolacaseusa.com
olacase.com
INSTALLATION MANUAL
RSCSBRPM118136159
(RolaCase Ram ProMaster Deep Setbacks)
E
Now that the partition unit is fully assembled, use two people to lift the assembly
into the van via the side door and position into place
F
Mark out the 6 positions on the factory roof beam frame that match the upper
partition header panel. Refer to the “A to F” orange bubble points in image below.
Note some models already have holes here in the correct positions
G
Mark out 4 positions on the factory corrugated floor where you will secure the base
of the Left and Right side partition panels. Note that there are 4 slotted holes per side
however you will only use 2 points per side where the high ridges of the floor meets
up against the base of the partition panels. Refer to the “G to K” red bubble points in
the image below
H
Use two people to temporarily move the partition out of the way
I
If necessary, drill the 6 points on the factory roof beam that you previously marked
out to secure the 6x “M6” Rivet Nuts supplied, these would be the “A to F” orange
bubble points in the image below
J
Drill the 4 points on the factory floor that you previously marked out to secure the
4x “M8” Rivet Nuts supplied, these would be the “G to K” red bubble points on the
next image
K
Use two people to reposition the partition in the correct and final resting place
L
Insert the 10x “M6 x 20mm” pan bolts and spring washers through the partition
wings and into the factory captive nuts on the “B pillar” of the vehicle. There are 5
bolts per side setback wing, 10 bolts in total. Refer to the “1 to 10” blue points in the
image above
M
Insert the 6x “M6 x 20mm” pan bolts and spring washers through the header
panel and into the Rivet Nuts on the roof pillar of the vehicle. Refer to the “A to F”
orange bubble points in the image above
N
Insert the 4x “M8 x 20mm” hex bolts and spring washers through the side panels
and into the Rivet Nuts on the floor of the vehicle. There are 2 bolts per side, 4 bolts
in total. Refer to the “G to K” red bubble points in the image above
O
Go back through and tighten all bolts securing the partition assembly to the vehicle
1
I
K
G
H
A
A
B
B
C
C
D
D
E
E
F
F
2
3
4
5
6
7
8
9
10