Operation of the Centric Clamp | 6
KZS-H_KZS-HG
33 / 44
6.2
Mounting the Top Jaws
§
The machine is switched off and protected against being switched on
again.
§
The base and top jaws are cleaned.
1.
Place the top jaws on the base jaws and fix with the jaw fixing screws.
Observe the labelling of the jaws. (Top jaw 1 on base jaw 1, top jaw 2 on
base jaw 2.)
2.
Tighten the fixing screws with the permissible tightening torque (see
Checking the Tightness of Screw Connections [
).
ü
The top jaws are mounted.
Summary of Contents for KZS-H
Page 2: ......