R&S
®
ZV- Z58/Z59
Preparing for Use
1 Preparing
for
Use
This chapter gives an overview of the front panel controls and connectors of the R&S ZV-Z58 and
R&S ZV-Z59 calibration units and gives all information that is necessary to put the units into operation
and connect external devices.
CAUTION
General safety instructions
Please observe the instructions of the following sections so that you cannot
endanger people or cause damage to the unit. This is of particular importance
when you use the unit for the first time. Also observe the general safety
instructions at the beginning of this manual.
Chapter 2 provides an introduction to the operation of the calibration unit. For further information
including remote control reference refer to the online help system of your network analyzer or its
printed/printable version delivered on CD-ROM. A more detailed description of the hardware connectors
and interfaces is also part of the help system.
Front Panel
The front panel of the calibration unit provides the STANDBY key, a USB type B connector, and 8 RF
connectors representing the calibration ports of the unit.
1164.0696.92 7
E-4