Getting Started
R&S
®
ZNB/ZNBT
15
User Manual 1173.9163.02 ─ 38
3 Getting Started
3.1 Putting the Analyzer into Operation
This section describes the basic steps to be taken when setting up the analyzer for the
first time.
Simple measurement examples are provided in
Chapter 3.4, "Performing Measure-
on page 65; for a description of the operating concept refer to
on page 41. For all background and reference informa-
tion concerning manual and remote control of the instrument refer to your analyzer's
help system or user manual. A more detailed description of the hardware connectors
and interfaces is also part of the help system or user manual.
Risk of injury due to disregarding safety information
Observe the information on appropriate operating conditions provided in the data sheet
to prevent personal injury or damage to the instrument. Read and observe the basic
safety instructions provided with the instrument, in addition to the safety instructions in
the following sections. In particular:
●
Do not open the instrument casing.
Risk of instrument damage due to inappropriate operating conditions
An unsuitable operating site or test setup can damage the instrument and connected
devices. Before switching on the instrument, observe the information on appropriate
operating conditions provided in the data sheet. In particular, ensure the following:
●
All fan openings are unobstructed and the airflow perforations are unimpeded. The
minimum distance from the wall is 10
cm.
●
The instrument is dry and shows no sign of condensation.
●
The instrument is positioned as described in the following sections.
●
The ambient temperature does not exceed the range specified in the data sheet.
●
Signal levels at the input connectors are all within the specified ranges.
●
Signal outputs are connected correctly and are not overloaded.
3.1.1 Unpacking and Checking the Instrument
Check the equipment for completeness using the delivery note and the accessory lists
for the various items. Should you notice any damage, immediately contact the carrier
who delivered the instrument.
Putting the Analyzer into Operation