
Putting into Operation
R&S
®
RT-ZC20
20
User Manual 1409.7814.02 ─ 01
Fig. 3-6: Oscilloscope inputs
2. In the VERTICAL section on the front panel, press the CH1 key.
3. On the first page of the "Channels" menu, set:
● Coupling: "DC"
● Termination: "1
MΩ"
Press "More".
Fig. 3-7: RTM Channel1 menu 1st page
4. Press "Probe" on the second page of the "Channels" menu.
Fig. 3-8: RTM Channel1 menu 2nd page
5. In the "Probe" menu, set:
● Unit: "Ampere"
● Gain: 100 mV/A
Connecting the Probe to R&S Oscilloscopes