Rohde & Schwarz 1333.1005K02 Getting Started Download Page 9

Preparing for Use

R&S

®

RTB2000

9

Getting Started 1333.1605.02 ─ 05

3 Preparing for Use

3.1 Unpacking and Checking the Instrument

1. Inspect the package for damage.

If the packaging material shows any signs of stress, notify the carrier who delivered
the instrument.

2. Carefully unpack the instrument and the accessories.

3. Check the equipment for completeness. See section 

"Delivery contents"

on page 9.

4. Check the equipment for damage.

If there is damage, or anything is missing, immediately contact the carrier as well
as your distributor. Make sure not to discard the box and packing material.

Packing material

Retain the original packing material. If the instrument needs to be transported or ship-
ped later, you can use the material to protect the control elements and connectors.

Delivery contents

The delivery package contains the following items:

R&S

 

RTB2000 digital oscilloscope

R&S RT-ZP03 probes (2x for R&S

 

RTB2002; 4x for R&S

 

RTB2004)

Country-specific power cable

Printed "Getting Started" manual

Printed "Basic Safety Instructions" brochure

3.2 Positioning the Instrument

The instrument is designed for use under laboratory conditions. It can be used in
standalone operation on a bench top or can be installed in a rack.

For standalone operation, place the instrument on a horizontal bench with even, flat
surface. The instrument can be used in horizontal position, or with the support feet on
the bottom extended.

The instrument can be installed in a 19" rack mount using a rack mount kit. The order
number of the rack mount kit is given in the data sheet. The installation instructions are
part of the rack mount kit.

 

 

 

Positioning the Instrument

Summary of Contents for 1333.1005K02

Page 1: ...R S RTB2000 Digital Oscilloscope Getting Started Getting Started 1333 1605 02 05 Q 52...

Page 2: ...41 29 0 Fax 49 89 41 29 12 164 Email info rohde schwarz com Internet www rohde schwarz com Subject to change Data without tolerance limits is not binding R S is a registered trademark of Rohde Schwar...

Page 3: ...lease Notes and Open Source Acknowledgment 8 3 Preparing for Use 9 3 1 Unpacking and Checking the Instrument 9 3 2 Positioning the Instrument 9 3 3 Starting the Instrument 10 3 3 1 Powering On 10 3 3...

Page 4: ...Contents R S RTB2000 4 Getting Started 1333 1605 02 05...

Page 5: ...art of the product documentation It warns you about the poten tial dangers and gives instructions how to prevent personal injury or damage caused by dangerous situations Safety information is provided...

Page 6: ...ll is 10 cm Signal levels at the input connectors are all within the specified ranges Signal outputs are correctly connected and are not overloaded Instrument damage caused by electrostatic discharge...

Page 7: ...etting started manual The online version of the user manual provides the complete contents for immediate display on the internet Instrument help The help offers quick context sensitive access to the f...

Page 8: ...The document is available on https gloris rohde schwarz com calcert You need the device ID of your instrument which you can find on a label on the rear panel 2 4 Release Notes and Open Source Acknowle...

Page 9: ...material to protect the control elements and connectors Delivery contents The delivery package contains the following items R S RTB2000 digital oscilloscope R S RT ZP03 probes 2x for R S RTB2002 4x fo...

Page 10: ...an cause the R S RTB2000 to overheat which can impair the measurement results disturb the operation and even cause damage Ensure that all fan openings are unobstructed and that the airflow perforation...

Page 11: ...e instrument 3 3 2 Starting Up and Shutting Down To start up the instrument 1 Make sure that the R S RTB2000 is connected to the AC power supply and the main power switch on the rear panel is in posit...

Page 12: ...loses its current settings Furthermore program data can be lost Press the Standby key first to shut down the application properly 3 4 Replacing the Fuse The instrument is protected by a fuse You can f...

Page 13: ...1 Front panel of R S RTB2004 with 4 input channels 1 Display 2 Horizontal and vertical setup controls 3 Trigger settings action and analysis controls 4 Analog input channels 2 channels at R S RTB2002...

Page 14: ...sures to preclude direct contact with the measurement setup Use only insulated voltage probes test leads and adapters Do not touch voltages higher than 30 V RMS or 42 V peak or 60 V DC Risk of injury...

Page 15: ...nectors for the pattern generator P0 P1 P2 P3 The Demo 1 signal is intended for demonstration purposes PROBE COMP 7 Probe compensation terminal to support adjustment of passive probes to the oscillo s...

Page 16: ...a Local Area Network LAN It supports up to 1 Gbit s USB type B 2 USB 2 0 interface of type B device USB for remote control of the instrument Note Electromagnetic interference EMI can affect the measur...

Reviews: