
8
For 2-7 man Lev Sleds: See steps 3 & 4 for Ram Unit and Pad installation. To begin assembly lay Mod
Sled runner on its side. Connect the runner to the connection link and then stand runner upright to connect
the next sled runner. Hardware used for the Connection Links is (4) 5/8” x 6” bolts, (4) 5/8” nuts, and (8) 5/8”
washers per Mod Sled Runner.
5