E3
TECHNICAL
DETAILS
SAFETY
PRECAUTIONS
INSTALLATION
OPERATION
MAINTENANCE
EXPLODED AND
PARTS LIST
INSTALLATION
1. Unpack and inspect reel for damage.Turn by hand to check for smooth operation.Check for
completeness.
2. The cable reel must be installed in premises comforming to current regulation and standards
covering systems and work environments.
3. Secure the cable reel to the wall and the ceiling according to the installation diagrams.Using
screw anchors or suitable screws which must be fitted in the holes in the brackets.
4. Adjust the cable stopper to the suitable position when required.
OPERATION
1. Check reel for correct operation by slowly pulling out the cable.
2. To latch the reel, slowly pull out the cable to any point, Relax the cable to stop.
Note:
it can
not exceed the back end mark When the cable is pulled out,
3. To unlatch the reel,slowly pull the hose after relax
,
and then let the cable retract until the
cable stop rests against the cable guide.
4. When over loading, the thermal cut-out will cut off automatically,then push the red button
until restore.
Note:
To avoid damage to the reel,always hold on to the cable while it is rewinding.
MAINTENANCE
1. Make sure the Cord is in proper working order.
2. Clean the Cord with a cloth dipped in warm water to remove dirt or deposits and ensure
correct rewinding.
3. Do not use detergents or solvents which could prove incompatible with cable-winder materials.
4. Dismantling of the unit by unskilled personal could prove hazardous;the risk involved mainly
concerm the preloaded springs.
TROUBLESHOOTING
Failure: The cable can't be Conduction
Possible cause: Overload or overheat protection
Corrective Action: Press the red button on the side cover
on the wall & ceiling