Installation
Electrical Connections
98
MagneMotion
Rockwell Automation Publication MMI-UM013B-EN-P - April 2020
•
Connect the AC power cable from either the optional remote power supply or a
user-supplied power supply to the power distribution from the main power dis-
connect. Then, connect the DC power cable to the power connector on each
NC-E node controller as shown in
, tighten the mounting screws to
3 in•lb [0.34 N•m] – do not overtighten.
2.
Connect power to each NC-12:
•
Connect the AC power cable from either the optional remote power supply or a
user-supplied power supply to the power distribution from the main power dis-
connect. Then, connect the DC power cable to the power connector on each
NC-12 node controller as shown in
, tighten the connector shell fin-
ger tight only – do not overtighten.
3.
Connect power to each NC LITE:
•
When supplying Power over Ethernet to the NC LITE, make sure that the
Ethernet connection goes to a PoE enabled switch then plug the switch power
supply into the power distribution from the main power disconnect. Then, con-
nect the cable from the switch power supply to the switch.
•
When supplying power directly to each NC LITE, connect the AC power cable
from either the optional remote power supply or a user-supplied power supply
to the power distribution from the main power disconnect. Then, connect the
cable from the NC LITE power supply to the NC LITE as shown in
NOTICE
The NC-12 node controller does not support Power over Ethernet.
Never connect these node controllers to a powered Ethernet network
as damage to internal components can result.
NOTICE
The NC LITE node controller supports the MagneMotion custom
Power over Ethernet (+18V DC). Never connect the NC LITE to a
standard powered Ethernet network as damage to internal compo-
nents can result.