![Rockwell Automation Allen-Bradley PowerFlex SCR User Manual Download Page 61](http://html1.mh-extra.com/html/rockwell-automation/allen-bradley-powerflex-scr/allen-bradley-powerflex-scr_user-manual_1475768061.webp)
Specifications
A-19
PowerFlex SCR Bus Supply User Manual
Table A.G 1000A Unit Spare Part Numbers/Descriptions
Figure A.11 1000A Unit Printed Circuit Board Locations (top view)
Item Availability
(1)
Description
Rockwell Catalog No.
Qty.
1
—
1000A SCR Set
SK-20S-MCO600-22IO1
6
4
Yes
Fan Assembly
(2)
SK-D9-FAN2
1
5
—
1000A MOV Assembly
SK-20S-VBKSDK110
1
7
Yes
40A Fuse (Precharge fuses F7…F11)
(3)
SK-20S-F070B040S or
Westcode Type F070B040S or
Ferraz Shawmut Type 6.921CPgRC14.51 40
5
11
Yes
1000A, 700V Fuse (AC fuses F1…F6)
Torque to 25 N•m (221 lb•in).
SK-20S-069UR2S1000B or
Westcode Type 069UR2S1000B or
Ferraz Shawmut Type 6.9URD32TTF1000
6
12
Yes
Fuse Monitoring Switch
SK-20S-MS3V1-5
6
13
—
85 °C Thermostat
SK-20S-SWT85KSDKRW
1
14
—
1000A SCR Wire Harness
SK-20S-ZY110-1000
1
17
Yes
1000A Snubber Circuit Board
SK-20S-PR-GR3-5
1
19
—
600A and 1000A Cover
SK-20S-RW9582300-A
1
22
—
600A and 1000A Enclosure
SK-20S-RWU600-1000
1
23
—
15 µF, 1000V Capacitor
SK-20S-E62K85153D1W
2
26
—
4.7K Ohm, 130W Resistor
SK-20S-RW36FST4K7K
2
27
—
4.7 Ohm, 45W Resistor
SK-20S-RW33FST4R7K
1
28
—
1000A Bus Bar Set
SK-20S-BBKSDK110
1
31
—
Terminal Block Assembly
SK-20S-TBKSDKRW
1
32
—
40 mm tall x 40 mm O.D. Insulator
with M10 Thread
SK-20S-IN551520
5
34
Yes
Gate Driver Circuit Board
(4)(5)
SK-D9-SCRGDB1
1
35
Yes
480V SCR Precharge Circuit Board
(4)(6)
SK-D9-SCRPRE1-D
1
36
Yes
690V SCR Precharge Circuit Board
SK-D9-SCRPRE1-F
1
37
Yes
Master/Slave or Slave/Slave Wire Harness
(7)
SK-20S-D9-CBL1-DF
1
38
Yes
Precharge Relay
SK-20S-CA2KN31F7
1
(1)
Important:
SCR Bus Supplies are designed to be field maintained only. Normal maintenance components (fan, fuses, fuse monitor
switch, printed circuit boards (precharge, gate, and snubber), and precharge relay are available. Additional catalog numbers are
provided for troubleshooting and technical support information only.
(2)
Extensive disassembly is required to replace the fan assembly. Please consider using Rockwell Automation Remanufacturing Services.
(3)
When replacing these fuses, always properly position them so that their fuse trip indicators (plungers) point toward the fuse trip
detection board.
(4)
This is an ESD sensitive component.
(5)
Not required for 1000A Standalone unit, but required for 1000A Master unit or 1000A Slave unit (both mounted in lower location).
(6)
Not required for 1000A Slave unit, but required for 1000A Standalone unit (mounted in lower location) or 1000A Master unit (mounted in
upper location).
(7)
Not required for a 1000A Standalone unit, but required to connect an existing 1000A Master or Slave unit to another 1000A Slave unit
(gate driver circuit board mounted in lower location).
Precharge Board
SK-D9-SCRPRE1-x
Gate Drive Board
SK-D9-SCRGDB1
1000A
Slave Unit
1000A
Master Unit
1000A
Standalone Unit
Gate Driver Board
SK-D9-SCRGDB1
Precharge Board
SK-D9-SCRPRE1-x
Summary of Contents for Allen-Bradley PowerFlex SCR
Page 1: ...PowerFlex SCR Bus Supply Firmware Version 1 xxx User Manual...
Page 4: ...soc ii Summary of Changes PowerFlex SCR Bus Supply User Manual Publication 20S UM001G EN P...
Page 6: ...ii Table of Contents PowerFlex SCR Bus Supply User Manual Publication 20S UM001G EN P...
Page 62: ...A 20 Specifications PowerFlex SCR Bus Supply User Manual Publication 20S UM001G EN P Notes...
Page 64: ...B 2 History of Changes PowerFlex SCR Bus Supply User Manual Publication 20S UM001G EN P Notes...
Page 67: ......