
Page
6
dence of overheating, terminations should be
cleaned or replaced. Before re-energizing the MCP,
all terminations and cables should be refurbished to
the originally installed condition.
Check MCP mounting hardware, and tighten if nec-
essary.
Exposure to certain types of chemicals can cause
deterioration of electrical connections. Check area
where MCP is installed for any safety hazards,
including personal safety and fire hazards and take
required precautionary actions.
The operation of
with electronic trip units can
be field tested periodically using the electronic test
kit. Contact Allen-Bradley for details.
Field Testing
Any field testing should be done in accordance with appli-
cable NEMA Standard.
Table 4-1. Instantaneous Trip Settings (Amperes)
Cam
Setting
A
B
C
D
E
F
G
H
MCP Catalog Number
1800
2400
3000
3600
4200
4800
5400
6000
1000
1250
1500
2000
2500
3000
3500
4000
500
600
800
1000
1250
1500
2000
2500
Handle
Position
Indicator
International
Symbols
Color: Red
-
ON
-
OFF
White
-
TRIP
Green
-
OFF (Reset)
I
Trip
PUSH-TO-TRIP
Adjustment
Button
Electronic
Trip Unit
Fig.
4-
MCP Manual Controls
4
40752-081(1)
Effective 2/03
140M-Q8P-D60
140M-Q8P-D40 140M-Q8P-D25