Rockwell Automation Publication 1512A-UM101B-EN-P - December 2021
41
Chapter 4 Common Installation
Insulated Power Bus Splicing
If the starter is equipped with insulated power bus, then a splice kit with
insulated links, insulating boots, and tape will be provided. See the kit for
installation instructions.
Ground Bus
1. See
to determine the correct ground splice configuration and
assemble as shown.
2. Torque the hardware to 14.5 N•m ± 1 N•m (11 lb•ft ± 1 lb•ft).
3. Check all hardware for correct tightness and replace all covers and plates.
Figure 32 - Typical Ground Bus Splicing Configuration (Front View)
ATTENTION:
Verify all barriers are replaced before re-energizing the
equipment. Failure to do so may result in electrical faults and cause
damage to equipment or severe injury to personnel.
Ground Bus Support
Main
Ground
Bus
Hex Nut
Lock Washer
Flat Washer
Ground Bus Splice Bar
ATTENTION:
Verify all barriers are replaced before re-energizing the
equipment. Failure to do so may result in electrical faults and cause
damage to equipment or severe injury to personnel.