
Installation
Transport System Installation
QuickStick HT User Manual
207
Rockwell Automation Publication MMI-UM007F-EN-P - September 2020
9.
Run the LVDC power cable to the next motor controller in the path, route the cable so
it is shielded from damage and can be easily accessed for service.
10.
Repeat
for each motor controller in the power chain.
NOTE:
It is not necessary to connect all motors on a path to the same power supply
or to connect a power supply to only one path.
11.
Bundle and dress all power cables (use nylon cable-ties) as required to keep all cable
routing clean.
12.
Make sure that all NC LITE node controllers are mounted to grounded surfaces.
13.
Make sure that the Ground stud on all NC-12 node controllers is connected to GND
(PE).
14.
Make sure that all NC-E and NC-S node controllers are grounded through the chassis
ground connection in their power connectors.
15.
See