
Roche Diagnostics
Operator’s Manual · Version 1.0
C-3
URISYS 2400
5 Daily operation
Initial preparations
Initial preparations
Before switching on the power to operate the analyzer, perform the following
tasks:
o
Fill the water supply tank with deionized water and place the liquid level
detector in the water supply tank.
o
Ensure that the TS transfer base is inserted correctly.
o
Empty the strip waste container and ensure that it is positioned correctly.
o
Empty the liquid waste tank.
o
Place an empty rack tray on the rack output line.
o
Remove all air bubbles from the syringes after switching on the analyzer.
Summary of Contents for URISYS 2400
Page 1: ...Operator s Manual Version 1 0 URISYS 2400...
Page 4: ...Roche Diagnostics iv Operator s Manual Version 1 0 URISYS 2400...
Page 6: ...URISYS 2400 Roche Diagnostics vi Operator s Manual Version 1 0...
Page 14: ...Roche Diagnostics xiv Operator s Manual Version 1 0 URISYS 2400...
Page 15: ...Part A is an overview of the URISYS 2400 Overview A...
Page 16: ......
Page 23: ...Part B is the system description of the URISYS 2400 System description B...
Page 24: ......
Page 57: ...Part C contains the operating procedures for the URISYS 2400 Operation C...
Page 58: ......
Page 102: ...Roche Diagnostics C 44 Operator s Manual Version 1 0 6 Special operations URISYS 2400 Checks...
Page 103: ...Part D describes all maintenance procedures relating to the URISYS 2400 Maintenance D...
Page 104: ......
Page 122: ......
Page 147: ...Part F describes the technical specifications relating to the URISYS 2400 Appendix F...
Page 148: ......
Page 155: ...Glossary and index G...
Page 156: ......