2. PREPARING THE PLACE FOR THE INSTALLATION

The Broadway Round spa can function indoors and outdoors. It must 
be installed on a firm base to prevent it from sinking.

When choosing the location for the spa, a series of requirements 
must be taken into account:

- If you have decided to install the spa indoors, bear in mind the 
thoroughfares required for transporting it to its final location.

- The electrical connection of the equipment must be carried out 
with a 3 conductor cable with a section of 4 mm

2

 and ready for 230 

VAC (the nominal power consumed by the standard equipment is 
equal to 5,0 kW).

- An earth connection compliant with current legislation is essential.

- Access to interior components through the side panels for post-
installation maintenance.

- You must also bear in mind how you are going to fill and empty 
the spa. The floor must be level. (Fig. 3).

- There must be adequate ventilation in closed interior locations.

- You must bear in mind the materials used on the wall and ceilings, 
since the humidity generated by the spa requires steam-resistant 
materials.

- Due to unavoidable splashing, the floor must be highly-resistant 
to water, such as tiles or plastic coverings. If carpets are used, they 
must be treated to avoid bacteria from damp. Use special sailing 
carpets or rugs. Parquet or wooden floors are not advisable unless 
they have been duly treated for this kind of use, such as wood for 
gardens or outdoor buildings. In any case, make sure that the floor 
has a gradient of 2% towards a drain installed in the room.

3. POSITIONING THE SPA

- For appropriate operating conditions, the spa must be positioned 
on a carefully levelled, firm base.
- The weight of the full spa and with three people in it is approxima-
tely 1000 kg. This weight is supported on 9 points - the legs - with a 
load on the floor of 400 kg/m

2

.

- Level the spa by adjusting the legs (Fig. 3). 
- Position the spa in a way that best enables maintenance through 
the wooden panels.

-When installing the spa in a corner or next to a side wall, remember 
to leave 0.5 metres or connection or installation work or fit trap doors 
with a minimum size of 1700x700 mm for accessing all the sides for 
post-installation maintenance. 
- This spa cannot be embedded. Do not obstruct access to the side 
panels. 

The following diagrams show the distribution of the support points 
and the position of the spaces inside the spa.

4. ELECTRICAL CONNECTIONS

The electrical installation must be carried out by an authorised elec-
trician. The internal connections of the equipment have been made 
at the factory (Fig. 4). The electrical installation of the spa must be 
protected by a 30 mA differential switch and a 25 A magnetother-
mal switch with omnipolar disconnection devices and a distance 
between contacts of at least 3 mm. Both switches must be situated 
outside the volumes as shown in fig. 5.

1765

1580

660

600

440

Skimerofiltr

Electric connection

1 phase 230V 3 x 4 mm

2

F

IL

T

E

R

L

IG

H

T

J

E

T

S

 2

J

E

T

S

 3

J

E

T

S

 1

D

O

W

N

U

P

A

IR

C

L

O

C

K

E

C

O

N

O

2

1

3

Sewage connection

50 mm

Water connection 1/2”

for water filling

4.1. EARTH CONNECTION
For the circuit-breaker to function correctly, there must be an insta-
llation with an earth connection in the home.

4.2. EQUIPOTENTIAL CONNECTION
The spa has a terminal for a 4 mm

2

 section cable which joins all the 

metal parts of the apparatus electrically and which must be connec-
ted to the equipotential connections grid of the home. This terminal 
must not be connected to the mains supply earth of the spa.

4.3. MAINS SITUATION
The mains supply cable of the spa must be connected to a fixed 
installation. A plug is not acceptable.

The electrical installation must be compliant with current legisla-
tion governing low voltage. For this, it is important to bear in mind 
that four protection blocks are established where the spa is to be 
installed, defined as shown in the following diagram, (fig. 5). Where 
block 3 is appropriate for the mains, or a false ceiling with a height 
of over 2.25 m.

4.4. MAINS CONNECTION
For the mains connection, the following must be taken into ac-
count:
- The power supply of the spa must be permanently connected to 
a fixed electrical conduit.

550

765 830

355

90

40

Fig. 3

Fig. 4

Summary of Contents for Broadway Round

Page 1: ...1 Installation Instructions SPA BROADWAY ROUND...

Page 2: ...PREPARING THE PLACE FOR THE INSTALLATION 4 3 POSITIONING THE SPA 4 4 ELECTRICAL CONNECTIONS 4 4 1 Earth connection 4 4 2 Equipotential connection 4 4 3 Mains situation 4 4 4 Mains connection 4 5 HYDRA...

Page 3: ...cally the blower pump Between 15 and 12 blower operates for 1 minute every 120 minutes Between 12 and 9 blower operates for 1 minute every 60 minutes Between 9 and 6 blower operates for 1 minute every...

Page 4: ...r next to a side wall remember toleave0 5metresorconnectionorinstallationworkorfittrapdoors with a minimum size of 1700x700 mm for accessing all the sides for post installation maintenance This spa ca...

Page 5: ...Vol 3 Please note The space below the spa tank is considered volume 3 as a tool is required to remove the panels 6 FILLING AND EMPTYING THE SPA Never use the air blower circuit to fill the spa The spa...

Page 6: ...the Broadway Round D D P E H G F K R V T Z2 Z1 I D 2 air regulators P Control panel E Blower R Heating element F Filter skimmer T Empty fill tap G Ozone generator V Empty fill H Filter hydromassage p...

Page 7: ...ER OZONE L1 N PE R91 R90 R89 R88 R120 R119 R118 R94 N L L N PE L N PE PUMP 1 PUMP 2 L LO N PE PUMP 2 L HI N PE PUMP 1 L LO N PE L HI N PE L1 L2 L3 N PE INPUT VOLTAGE LIGHT RELAY 30A 250VAC RELAY 16A 2...

Page 8: ...ch km 2 5 B P 571 26000 Settat Maroc Telf 212 0 23 40 59 41 212 0 23 40 03 39 Fax 212 0 23 40 59 42 Roca GmbH Feincheswiese 17 56424 Staudt Deutschland Tel 49 0 2602 93610 Fax 49 0 2602 936 122 Roca P...

Reviews: