![ROC LL1GBQ24-B26CG Manual For Use, Installation And Maintenance Download Page 21](http://html1.mh-extra.com/html/roc/ll1gbq24-b26cg/ll1gbq24-b26cg_manual-for-use-installation-and-maintenance_1471900021.webp)
Note:
The
flue shall not contact with or close to flammable material, and
must not pass through the walls or building structures made of
flammable material. When replacing an old boilers, the flue system
also must be changed.
Important
Ensure that t
he flue i
s not blocked.
Ensure that the flue is installed and fixed in accordance with below
these instructions.
Coaxial pipe room accessories(Φ60/100 level):
1×Silicon O ring(60mm)
1×Elbow (90°)
2 ×Include wall seal ring (internal and external)
1×Flue include terminal (1m-60/100)
2×Flue clamp
4 ×Screw
2×Seal ring
21
Installation without extension
Installation with extension
Level
Level
Level
Min slope
1
0
=17.5mm per minute