![Robur K18 Simplygas Installation Manual Download Page 24](http://html.mh-extra.com/html/robur/k18-simplygas/k18-simplygas_installation-manual_1471521024.webp)
Electrical hookup
24
3
Figure 3�7
Q3 diverter valve connection to CSK18 enclosure terminal block and RVS21.826 – Case 3
A
Detail of CSK18 enclosure terminal block
B
Flow from K18
C
DHW coil outlet
D
Heating outlet
E
Signal (phase present in DHW service)
F
Signal (phase present in heating service)
G
Orange connector X15 (left edge of
RVS21.826 board)
N
Neutral
Q3 Diverter valve
CASE 3
Valve with two signals (230VAC phase) alternative-
ly active for DHW and heating
3.4.2
Y1/Y2 mixer valve connection (if present)
Figure 3�8
Y1/Y2 mixer valve connection (for mixed heating circuit 1) to RVS21.826
A
Green connector X12 (left edge of
RVS21.826 board)
B
Flow from system
C
Heating circuit 1 outlet
D
Heating circuit 1 inlet
E
Y2: close flow from system
F
Y1: open flow from system
Y1/Y2
mixer valve