background image

 

 

7

 / 

10

 

 

STEP#4 Mounting the Infrared Light Camera 

Fix the Nylon column 

7

  on the camera 

8

  with the screws 

16

 

Mount the camera to the base frame using screw 

17

 

 

 

 

 

16

 

7

 

7

 

8

 

7

 

7

 

8

 

7

 

8

 

16

 

x2

 

x1

 

x2

 

17

 

17

 

17

 

x2

 

Summary of Contents for Laser Projection Keyboard Kit

Page 1: ...Assembly Manual RoboPeak Team 2013 4 Revision 0 Your laser projection keyboard kit needs to be assembled before you can use it This manual will provide you the instructions to assemble the RoboPeak laser project keyboard kit quickly and easily ...

Page 2: ...the Item No in the list The item No will be used to identify which part will be used in the following assembly instructions Side Frame x2 Front Panel x1 Camera Dock x2 Bottom Base x1 Pattern Projector Dock x1 Linear Laser Locker x1 Nylon column x2 Infrared Light Camera x1 Keyboard Pattern Projector x1 Linear Laser x1 1 2 3 4 5 6 7 8 9 10 ...

Page 3: ...3 10 Power Sockets PCB x1 Camera Signal Cable x1 Screw Cap x8 Self tapping Screw x2 Screw pad x4 5mm Screw x4 10mm Screwx4 12mm Screw x7 16mm Screw x6 11 12 13 14 15 16 17 18 19 ...

Page 4: ...epare the base frame units with the item No 1 2 3 and the screws with No 19 and the screw cap 13 Please assemble them based on the following figures Pay attention to the side of the camera dock 3 1 x2 1 1 3 2 2 3 x1 x1 13 x6 19 x6 13 19 13 19 ...

Page 5: ...5 10 STEP 2 Bottom Base Installations Place the bottom base 4 in the bottom of the assembled frame and use the screw 16 to fix it 4 18 18 18 18 4 4 x1 18 x4 ...

Page 6: ... use the self tapping screw 14 to fix them Place the assembled projector parts to the base frame as depicted in the following figure Use the screw 18 and the screw cap 13 to fix them Make the power cable of the projector go through the hole of the front panel 9 5 14 9 5 5 9 14 x1 x1 x2 18 18 13 13 13 18 x2 x2 ...

Page 7: ...7 10 STEP 4 Mounting the Infrared Light Camera Fix the Nylon column 7 on the camera 8 with the screws 16 Mount the camera to the base frame using screw 17 16 7 7 8 7 7 8 7 8 16 x2 x1 x2 17 17 17 x2 ...

Page 8: ... the laser and use the screws 6 to fix them Insert the screw 18 on the top of the locker 6 but do not tighten it currently Check the linear laser in front of the front frame Please make sure the wavy stripe in the linear laser head is perpendicular to horizontal plane After that the screw 18 can be tightened 16 6 10 18 6 16 18 10 x1 x1 x2 x1 ...

Page 9: ...the screw pads 15 on the screw holes of the bottom base Place the PCB 11 on the bottom base and use the screws 18 to fix them Connect all the cables Don t forget to connect the camera 8 to the PCB using the signal cable 12 15 15 15 x2 11 18 18 12 12 11 18 x1 x1 x2 ...

Page 10: ...10 10 Finished Now your laser projector kit is ready to work Before the first use please follow the instructions of the calibration manual ...

Reviews: